SCP-001-EBERSTROM-S-PROPOSAL-ARC
Euclid
~
medium confidence
Eberstrom's Proposal-ARC
Expected annual
$1.5B
One-time setup
$3.8B
Annual recurring
$1.4B
Personnel
2500
Estimated one-time capital establishment is approximately $3.82B driven by hardened construction, power infrastructure, and contingency reserves; annual operating costs are approximately $1.37B/yr driven primarily by staff wages, large-scale research, scalability reserves, and logistics/fuel.
One-Time Capital Costs
Total: $3.8B
Annual Recurring Costs
Total: $1.4B/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4B/yr
Normal year with no major incidents: steady operations, scheduled research, routine relocations handled without breach or political exposure.
scheduled relocation cycles
routine maintenance and research ops
🚨
Minor Incident
$1.4B/yr
Localized containment failure or infrastructure damage requiring repairs and emergency response but no major breach of high-risk SCPs.
localized containment breach
severe weather during relocation
temporary power outage
🚨
Major Breach
$1.9B/yr
Significant containment breach requiring large-scale recovery, replacement systems, international operations and possible reconstruction.
multi-module containment failure
loss of critical power/safety systems
🚨
Political Exposure
$2.4B/yr
Government or public exposure at an event causing expensive diplomatic, legal, and covert remediation actions plus potential site relocation/rebuild.
unauthorized satellite leak
diplomatic incident where landing occurs in sensitive territory
Personnel
2500 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 800 | [#6, #23] On-site armed security, rapid-response teams and internal enforcement personnel. |
| Research Scientist | 600 | [#14, #15] Scientists for relocation-mechanism research, field teams and data analysis. |
| Engineer / Maintenance | 300 | [#1, #24, #20] Structural, mechanical and systems engineers to maintain hardened site and adapt to terrain changes. |
| Logistics & Supply Staff | 250 | [#10, #7, #4] Personnel managing resupply missions, charters, warehousing and fuel logistics. |
| Administrative Staff | 200 | [#9, #21, #27] Administration, procurement (including cover operations), and financial/accounting staff. |
| Containment Specialists / Technical Staff | 100 | [#2, #25] Specialists for containment module maintenance, sensor operation and evidence safekeeping. |
| Medical Officer | 150 | [#12] Hospital staff, medevac coordination and mental health providers. |
| Security Technical / Communications specialists | 50 | [#8, #21] Communications, SIGINT/COMSEC and archive technical personnel. |
| Mental health / Counselors | 40 | [#12] Psychiatric care and long-deployment mental health support staff. |
| Site Director / Executive Staff | 10 | [#1] Executive leadership and site administration. |
Confidence Notes
Mid-level confidence: individual cost categories are grounded in analyst ranges and operational logic, but the SCP's anomalous relocation behavior, possible unseen containment needs, and geopolitical variables create wide uncertainty bands (several items have order-of-magnitude ranges).