SCP-001-METAPHYSICIAN-KARPIN-PROPOSAL
Keter
?
low confidence
Metaphysician/Karpin Proposal
Expected annual
$70.7M
One-time setup
$592.7M
Annual recurring
$64.5M
Personnel
84
Estimated one-time capital and contingency needs are in the low hundreds of millions (primarily full-containment upgrade and contingency reserves); baseline annual operating costs are dominated by specialized personnel, covert interdiction, research operations, and global monitoring.
One-Time Capital Costs
Total: $592.7M
Annual Recurring Costs
Total: $64.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$64.5M/yr
Normal operational year with no major incidents; routine ops, staffing, remote probes, and interdiction activity continue.
normal_operations
no_major_incident
🚨
Minor Incident
$67.5M/yr
Localized remediation or limited exposure incident requiring targeted remediation, additional medical care, and replacement of a probe or vehicle.
small_remediation_event
probe_or_vehicle_loss
limited_personnel_exposure
🚨
Major Breach
$114.5M/yr
Containment breach involving human exposure, larger remediation, emergency MTF response and significant investigative operations.
breach_with_exposure
major_remediation_and_PR
extended_MTF_deployment
🚨
Catastrophic Breach
$364.6M/yr
Large-scale catastrophic failure or public exposure requiring use of contingency funds, major remediation/containment upgrade, mass evacuation and global interdiction surge.
public_exposure
aperture_expansion
activation_requiring_full_upgrade
Personnel
84 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | 24/7 armed perimeter staffing, rapid-reaction MTF rotations and specialized security contractors [#4]. |
| Research Scientist | 20 | Xenobiologists, memeticists, ontologists, AI engineers and laboratory scientists for ongoing R&D and analysis [#9, #7, #17]. |
| RAISA / Data Specialist | 8 | Air-gapped archival operators, secure playback specialists, and cryptographic/data-curation roles [#8, #15]. |
| Engineer / Maintenance | 10 | Power/HVAC/UPS technicians, vehicle maintainers, instrumentation engineers for field and site systems [#3, #5, #14]. |
| Medical Officer | 4 | BSL-capable medical staff, memetic-psych care providers and emergency responders [#11]. |
| Administrative Staff | 5 | Logistics, procurement, legal liaison, and administrative support for site operations [#20]. |
| Site Director / Executive Staff | 1 | Senior site leadership and liaison to O5/central command [#32]. |
| Contractors / External Specialists | 6 | Short-term hires, external lab contractors and vetted academic partners under NDA for specialized tasks [#28]. |
Confidence Notes
Large ranges, open-ended sociopolitical operations, and contingency-level items cause significant uncertainty. Many cost items (covert ops, full-containment upgrades, reserve funds) are intentionally open‑ended in the source notes; estimates are best-effort midpoints and programmatic judgments rather than precise quotes.