SCP-001-ROUNDERHOUSE-GOLDER-PROPOSAL
Unknown
?
low confidence
ROUNDERHOUSE's Golder Proposal: Director's Cut
Expected annual
$27.4M
One-time setup
$140.7M
Annual recurring
$25.2M
Personnel
58
Estimated initial (one-time) capital outlay of approximately $141M driven primarily by habitat build-out, transport/vertical-access hardware, emergency demolition capability and contingency; recurring operating costs are roughly $25M/yr driven by staffing, life support, logistics and sustained research.
One-Time Capital Costs
Total: $140.7M
Annual Recurring Costs
Total: $25.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$25.2M/yr
Normal uneventful year with routine operations, research and maintenance.
routine_research
scheduled_rotations
no_security_incidents
🚨
Minor Incident
$27.2M/yr
Localized incident requiring emergency response, limited evacuation, repair and extra analysis.
localized_breach
artifact_unstable
small-scale_evacuations
🚨
Major Breach
$75.2M/yr
Significant containment breach or structural collapse requiring large-scale evacuation, repairs and possibly international diplomacy.
large_scale_breach
structural_instability
sustained_hostile_entities
🚨
Political Exposure
$125.2M/yr
Surface-state or public exposure requiring intensive diplomatic costs, covert operations, major legal/PR campaigns and potential relocation.
public_leak
hostile_state_involvement
legal_injunctions
Personnel
58 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 15 | Specialists in archaeology, geology, physics and related fields; core research staff. [#12] |
| Security Officer / MTF Agent | 20 | On-site security and rapid-response personnel. [#12, #13] |
| Technical / Support Staff | 9 | Engineers, electricians, IT, logistics and maintenance personnel. [#11, #12] |
| Medical Officer | 3 | On-site medics and medevac coordination. [#14, #12] |
| Administrative Staff | 4 | Site admin, records, scheduling and cover-story coordination. [#4, #19, #12] |
| Engineer / Maintenance | 4 | Power, habitat and heavy-equipment maintenance teams. [#6, #5, #11] |
| Conservator | 2 | Artifact handling, conservation and cataloguing specialists. [#9, #15] |
| Site Director / Executive Staff | 1 | Overall site leadership and liaison to Foundation command. [#12] |
Confidence Notes
Costs are broad estimates built from analyst ranges; significant unknowns (anomalous effects, diplomatic constraints, need for microreactor or destructive containment) make precise budgeting speculative.