SCP-001-ROUNDERHOUSE-GOLDER-PROPOSAL Unknown ? low confidence
ROUNDERHOUSE's Golder Proposal: Director's Cut
Expected annual
$27.4M
One-time setup
$140.7M
Annual recurring
$25.2M
Personnel
58
Estimated initial (one-time) capital outlay of approximately $141M driven primarily by habitat build-out, transport/vertical-access hardware, emergency demolition capability and contingency; recurring operating costs are roughly $25M/yr driven by staffing, life support, logistics and sustained research.
🏗️ One-Time Capital Costs Total: $140.7M
Contingency Program Reserve $42.0M
[#27] Program contingency (30% of capital + first 2 years of operations) to cover technical, anomalous and political overruns.
In Bubble Habitat Setup $20.0M
[#5] Prefab habitat modules, airlocks, water treatment, HVAC and sustained-stay facilities for ~30–50 personnel.
Facilities $10.0M
[#2] Persistent secure surface forward base setup (hardened containers, perimeter, helipad/runway improvements, living quarters).
Transport Asset Purchase $10.0M
[#3] Purchase of dedicated medium helicopter / heavy-lift airframe for direct access (capital acquisition option).
Specialized Vertical Access $10.0M
[#10] Heavy-lift rigging, cranes, scaffolding, rope-access systems and temporary internal elevators/platforms.
Emergency Demolition Setup $10.0M
[#23] Design and procurement of destructive containment capability: charges, sterilization equipment and deployment planning.
Decommissioning And Rehab $9.0M
[#26] Estimated 10% of capital program for site removal, remediation and amnestic sweeps on wind-down.
Initial Research And Lab Setup $7.0M
[#9, #18] Field laboratory build-out and high-end instrumentation procurement (AMS, mass-spec, conservation vaults).
Geopolitical And Land Use One Time $5.0M
[#20] Initial payments, covert agreements or land-use acquisition costs if access point lies on foreign/contested territory.
Heavy Equipment Fleet $4.0M
[#11] All-terrain vehicles, tracked vehicles, small cranes, forklifts, mobile workshops and transportable containers.
Mtf Readiness Setup $4.0M
[#13] Equip and train rapid-response/containment team, specialized equipment caches and initial readiness investment.
Reconnaissance And Mapping $1.5M
[#1] Initial multi-disciplinary survey: LiDAR/sonar, drones, aircraft sorties, sample retrieval and mapping.
Data Security And Cover Setup $1.5M
[#19] Initial cover-story creation, shell company/legal agreements and secure data center setup for censorship operations.
Access Control Setup $1.2M
[#4] Protocol development, tooling, secure credentialing and memetic/amnestic procurement for access control.
Power Generation $1.0M
[#6] Diesel generator farm procurement and installation (capital option chosen for moderate posture).
Communications And Data Setup $1.0M
[#7] Secure satellite uplink/relay hardware, encrypted network installation and physical transfer protocols.
Environmental Sensor Network $1.0M
[#8] Fixed sensor network: atmospheric, radiation, seismic, structural monitors and redundant nodes.
Medical Facilities Setup $800K
[#14] Field hospital kit, quarantine suite and diagnostic setup for on-site medical response.
Artifact Transport And Vaults $800K
[#15] Packaging, secure shipment protocols and climate-controlled off-site vault setup for high-value artifacts.
Long Term Archive Setup $800K
[#25] High-security archive construction for samples, data and restricted-access infrastructure.
Equipment $0
[]
High Level Estimates Note $0
[#28] High-level scale examples and guidance (non-additive summary).
🔄 Annual Recurring Costs Total: $25.2M/yr
Staff Wages $6.0M/yr
[#12] Payroll for core long-term staffing: researchers, security, technical/support, medics and administrative staff including rotation/hazard pay.
Research And Monitoring $3.1M/yr
[#8, #9, #15, #17] Telemetry/monitor maintenance, lab consumables, external sample analysis contracts and long-term research funding.
Logistics And Transport $2.7M/yr
[#3, #11] Charter/lease costs, fuel and maintenance for air assets and ground vehicle fleet operations.
In Bubble Life Support $2.5M/yr
[#5] Utilities, consumables and housekeeping for in-bubble habitat modules, water, sewage and climate control.
Geopolitical And Land Use $1.5M/yr
[#20] Ongoing covert payments, diplomatic/legal maintenance or deniable contractor costs if foreign access is necessary.
Insurance And Liability $1.5M/yr
[#22] Liability reserve, legal defense fund and budgeted insurance/reserve allocation for catastrophic risk.
Supplies And Consumables $1.4M/yr
[#16, #21] Consumables, reagents, archival materials, food, water, batteries, PPE and routine supply-chain rotations.
Facilities Maintenance $1.2M/yr
[#2] Ongoing O&M for surface forward base: guard payroll, utilities and site maintenance.
Power Generation $1.0M/yr
[#6] Fuel resupply and genset O&M (diesel supply chosen for moderate posture).
Mtf Readiness $1.0M/yr
[#13] Annual training, exercises and readiness for rapid-response/containment teams.
Cover Story And Legal $900K/yr
[#4, #19] Ongoing legal/PR retainers, amnestic administration and record-keeping related to information containment.
Specialized Vertical Access $800K/yr
[#10] Skilled rigging/rope-access teams and maintenance of lift/stabilization equipment.
Medical Services $500K/yr
[#14] Consumables, medevac readiness and on-site medical staffing supplement.
Communications And Data $300K/yr
[#7] Secure bandwidth, satellite service fees and data storage costs.
Emergency Demolition Maintenance $300K/yr
[#23] Storage, maintenance and regulatory compliance costs for demolition/sterilization caches and protocols.
Long Term Archiving $300K/yr
[#25] Archive staffing, digital security and restricted-access administration costs.
Psychological Support $200K/yr
[#24] Counseling, resilience programs and rotation/debrief support for personnel operating in anomalous environments.
Cost Scenarios
📊 Baseline (baseline) $25.2M/yr
87.0% probability / year
Normal uneventful year with routine operations, research and maintenance.
routine_research scheduled_rotations no_security_incidents
🚨 Minor Incident $27.2M/yr
10.0% probability / year +$2.0M vs baseline
Localized incident requiring emergency response, limited evacuation, repair and extra analysis.
localized_breach artifact_unstable small-scale_evacuations
🚨 Major Breach $75.2M/yr
2.0% probability / year +$50.0M vs baseline
Significant containment breach or structural collapse requiring large-scale evacuation, repairs and possibly international diplomacy.
large_scale_breach structural_instability sustained_hostile_entities
🚨 Political Exposure $125.2M/yr
1.0% probability / year +$100.0M vs baseline
Surface-state or public exposure requiring intensive diplomatic costs, covert operations, major legal/PR campaigns and potential relocation.
public_leak hostile_state_involvement legal_injunctions
👥 Personnel 58 total
Role Count Notes
Research Scientist 15 Specialists in archaeology, geology, physics and related fields; core research staff. [#12]
Security Officer / MTF Agent 20 On-site security and rapid-response personnel. [#12, #13]
Technical / Support Staff 9 Engineers, electricians, IT, logistics and maintenance personnel. [#11, #12]
Medical Officer 3 On-site medics and medevac coordination. [#14, #12]
Administrative Staff 4 Site admin, records, scheduling and cover-story coordination. [#4, #19, #12]
Engineer / Maintenance 4 Power, habitat and heavy-equipment maintenance teams. [#6, #5, #11]
Conservator 2 Artifact handling, conservation and cataloguing specialists. [#9, #15]
Site Director / Executive Staff 1 Overall site leadership and liaison to Foundation command. [#12]
📋 Confidence Notes
Costs are broad estimates built from analyst ranges; significant unknowns (anomalous effects, diplomatic constraints, need for microreactor or destructive containment) make precise budgeting speculative.
← SCP-001-ROUNDERHOUSE-GOLD-PROPOSAL ↑ All SCPs SCP-001-ROUNDERHOUSE-JADE-PROPOSAL →