SCP-001-TANHONY-S-PROPOSAL
Thaumiel
~
medium confidence
Tanhony's Proposal
Expected annual
$17.7M
One-time setup
$10.1M
Annual recurring
$17.5M
Personnel
52
Initial one-time setup is approximately $10.1M driven by containment chamber retrofit, OR/compute upgrades, archival purge and contingency reserve; recurring annual costs are about $15.5M driven primarily by personnel (security, medical, specialized research), ongoing readiness, supplies, and legal/cover operations.
One-Time Capital Costs
Total: $10.1M
Annual Recurring Costs
Total: $17.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$17.5M/yr
Normal operational year with no major incidents; routine staffing, maintenance, supplies, training and readiness costs only.
routine_operations
no_major_incident
🚨
Minor Incident
$18.7M/yr
Single Flamel-17 replacement or localized containment incident requiring surgery, ritual execution, targeted amnestic campaign and emergency mobilization.
flamel_17_replacement
localized_breach
surgical_complication
🚨
Major Breach
$23.5M/yr
Large-scale site breach and/or public exposure causing mass memetic contamination, full amnestic campaigns, international legal action and extensive contingency spending.
site_breach
public_exposure
mass_memetic_contamination
Personnel
52 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#2] 22–26 FTE frontline guards required to maintain six on-site at all times; chosen midpoint 24. |
| Medical Officer | 10 | [#3] 8–12 clinicians/nurses to provide 24/7 coverage (ER/trauma, nurses, anesthesia techs); chosen 10 to cover shifts. |
| Neurosurgeon (Contracted) | 2 | [#4] Two neurosurgeons (one in-house, one on rapid call/retainer) required for immediate intervention. |
| Cognitive Therapist / Cognito-agent Operator | 6 | [#5] 4–8 specialized cognitive therapists/operators for twice-daily reinforcement; chosen 6. |
| Research Scientist / Technician | 10 | [#12] Specialized thaumaturgy and Erikeshan researchers and technicians (6–15); chosen 10 to cover research program and experiments. |
Confidence Notes
Analyst notes provide detailed line-item ranges but many items have wide uncertainty (per-event spikes, institutional risk tolerance, existing Site-01 capabilities). Estimates use mid-range selections for budgeting; contingency and incident costs remain highly variable.