SCP-001-YOSHIHIDES-PROPOSAL
Keter-potissimi
~
medium confidence
Yoshihide's Proposal
Expected annual
$76.2M
One-time setup
$2.7B
Annual recurring
$59.1M
Personnel
175
Total one-time contingency and mitigation construction costs are in the low billions driven by large strategic options (relocation, orbital/deep-ocean mitigation) while baseline annual operations and containment maintenance run tens of millions per year driven by security staffing, medical care, research, and perimeter/sensor expansion.
One-Time Capital Costs
Total: $2.7B
Annual Recurring Costs
Total: $59.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$59.1M/yr
Normal operational year with no catastrophic incidents; ongoing containment, research, staffing and maintenance continue at baseline levels.
no major spread beyond existing perimeter
regular maintenance and research only
🚨
Minor Incident
$64.1M/yr
Localized containment failure requiring emergency response, targeted demolition/isolation and increased overtime/logistics but not strategic relocation.
local breach of administrative wing
targeted remote demolition and extra MTF deployments
🚨
Major Breach
$159.1M/yr
Significant breach necessitating large remediation actions: controlled demolition of exposed wings, accelerated vault construction and broad compensation/medical surge.
rapid uncontrolled spread into critical infrastructure
large-scale demolition and vault construction initiation
🚨
Catastrophic Abandonment
$683.1M/yr
Containment failure leading to site abandonment and execution of strategic relocation/neutralization (remote island move, large evacuation, long-term remediation).
failure to contain spread at Site-01
decision to relocate or perform large-scale strategic mitigation
Personnel
175 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 140 | [#22] Front-line security/MTF staffing portion of the permanent security ramp; included in staff_wages estimate. |
| Security Technician | 35 | [#22] Technical security/support personnel for sensors, checkpoints and perimeter systems; included in staff_wages estimate. |
Confidence Notes
Analyst notes supply many explicit ranges allowing mid-point estimates, but extreme outcome ranges (strategic/contingent options) and erratic anomalous behavior produce significant uncertainty.