SCP-015
Euclid
~
medium confidence
SCP-015
Expected annual
$5.4M
One-time setup
$9.6M
Annual recurring
$5.2M
Personnel
30
Estimated one-time startup and containment capital is approximately $9.6M driven by land acquisition, structural containment, sewer isolation and contingency reserves; recurring annual costs are approximately $5.24M driven primarily by staff wages (security and specialized response), ongoing surveillance, lab operations, and contingency provisioning.
One-Time Capital Costs
Total: $9.6M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal operational year with no major incidents; routine missions, maintenance, and replenishment only.
routine_operations
scheduled_missions
no_major_incidents
🚨
Minor Incident
$5.4M/yr
Localized bursts or protrusions requiring emergency response, cleanup and limited repairs.
localized_pipe_burst
small_contamination_event
short_term_overtime_and_cleanup
🚨
Major Breach
$7.7M/yr
Significant attachment to municipal infrastructure, multi-site contamination and large civil works required.
attachment_to_municipal_sewer
multiple_simultaneous_protrusions
extended_remediation
🚨
Catastrophic Breach
$15.2M/yr
Widespread infrastructure failure, public exposure or requirement for relocation/major containment upgrade.
mass_attachment
widespread_infrastructure_damage
civil_authorities_involvement
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | 9 full-time security/guard personnel to cover 24/7 shifts and site control. Mapped to recurring security staffing costs [#4]. |
| Site Observers / Surveillance Technicians | 3 | Dedicated observers/technicians to maintain continuous observation and data integrity. Mapped to recurring observation staffing [#4]. |
| Specialized Containment Response (Technician / Robotic Operator / Hazmat) | 14 | On-call specialized team for remote capping, robotics operation, hazmat response and rescue; mapped to specialized team recurring costs [#5]. |
| Medical Officer | 2 | On-site/contract medics for missions and 24/7 capability; mapped to recurring medical staffing costs [#9]. |
| Engineer / Maintenance | 1 | Engineer for facility, HVAC and robotics maintenance; labor costs incorporated within staff and equipment maintenance lines [#6, #10, #26]. |
| Administrative Staff / Site Director | 1 | Site director/administrative oversight for contracts, procurement and municipal coordination; administrative overhead applied in recurring budget [#16, #27]. |
Confidence Notes
Analyst notes provide clear line items and ranges enabling mid-point budgeting, but several items (land acquisition, sewer rerouting, urban density effects, and unquantifiable anomalous escalation) are highly site-dependent and could change totals by orders of magnitude.