SCP-017
Keter
✓
high confidence
SCP-017
Expected annual
$1.3M
One-time setup
$2.1M
Annual recurring
$1.3M
Personnel
9
Initial one-time capital expenditures are approximately $2.08M driven by containment room construction, redundant lighting systems, robotic maintenance, secondary-site redundancy and contingency funds. Recurring annual costs are ~ $1.28M driven primarily by staff wages, continuous power/consumables (lamps), research/monitoring, and legal/cover-up budgets.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with no major incidents; standard operations and scheduled maintenance only.
routine maintenance
scheduled research activity
🚨
Minor Incident
$1.3M/yr
Localized equipment failures requiring emergency repairs and overtime but no containment loss.
lamp burnout cluster
short generator outage
localized sensor failure
🚨
Major Breach
$2.8M/yr
Significant multi-system failure leading to partial containment breach requiring recovery operations.
simultaneous lamp and generator failure
human error during maintenance
🚨
Catastrophic Breach
$11.3M/yr
Prolonged total power/lighting failure or coordinated failure causing full containment loss with major casualties and facility loss.
complete long-duration power loss
compound human and equipment failures
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#13, #23] 24/7 security and control-room operators; salaries include hazard-pay premiums reflected in recurring hazard_pay_and_recruitment. |
| Research Scientist | 2 | [#13, #17] Senior research staff for ongoing SCP study and on-call analysis; costs included in staff_wages and research_and_monitoring. |
| Engineer / Maintenance | 1 | [#8, #15, #13] Technical staff for HVAC, lighting, robotic maintenance and preventative maintenance contracts. |
Confidence Notes
Detailed analyst notes provide line-item estimates and ranges for nearly all capital and recurring items; mappings are straightforward and use midpoints for ranges, so cost estimates are well-grounded though subject to regional price variance.