SCP-068 Safe ~ medium confidence
SCP-068
Expected annual
$2.6M
One-time setup
$1.2M
Annual recurring
$2.6M
Personnel
4
One-time capital costs of roughly $1.23M driven by construction of a metal-free inner chamber and redundant vault plus specialized non-metallic handling equipment; recurring annual costs ~ $2.55M driven by staff wages, ongoing research/monitoring, contingency reserves and retainer/response costs.
🏗️ One-Time Capital Costs Total: $1.2M
Facilities $800K
[#3, #4] Construction of dedicated non-metallic inner containment chamber (2 m-capable) and redundant external vault; includes structural work, composite/ceramic/polymer finishes and installation.
Remote Manipulators $125K
[#9] Custom non-metallic/isolated remote handling tools and manipulators for transfers, sampling and experiments.
Metal Exclusion Program Setup $60K
[#5] Initial facility metal-exclusion survey and remediation (replacement/relocation of exposed metal, non-metallic retrofits, baseline scans).
Thermal Retrieval Equipment $60K
[#10] High-temperature equipment (lasers/induction heaters/furnace) and specialized containment for melting surrounding materials to retrieve SCP.
Remote Test Rig $40K
[#8] Design, fabrication and safety-certification of an insulated non-metallic remote activation/test rig with interlocks.
Transport Modifications $40K
[#22] Non-metallic transport crate and vehicle protocol retrofits for secure transfers between sites (one-time crate/vehicle modifications).
Equipment $34K
[#1, #2, #7] One-time purchase of non-conductive PTFE/rubber storage box, modified non-metallic locker installation and galvanically-isolated camera/sensor array (hardware components).
Initial Research And Lab Setup $30K
[#11] Initial purchase and setup of hazard monitoring equipment for EM/beta/gamma/theta and neuroscientific logging (one-time instrumentation).
Power Isolation Infrastructure $30K
[#6] Installation of isolated circuits, mechanical key interlocks, galvanic isolation hardware and UPS for isolated monitoring systems (one-time installation).
Training Initial $12K
[#14] Initial training and procedural development costs for metal-exclusion protocols and emergency procedures.
🔄 Annual Recurring Costs Total: $2.6M/yr
Catastrophic Contingency Fund $1.0M/yr
[#29] Multi-purpose reserve for catastrophic failure/escalation (evacuation, larger-scale mitigation, misinformation operations).
External Coverup Fund $500K/yr
[#21] Reserve fund to repair/replace external public infrastructure or property without disclosure (scalable emergency fund).
Staff Wages $300K/yr
[#12] Salaries and benefits for containment staff (e.g., 1 lead researcher, 1 technician, 2 security guards as baseline staffing).
Research And Monitoring $240K/yr
[#11, #17, #25] Recurring analysis of emitted signals and EM monitoring, test materials budget and specialized ongoing research program.
Emergency Response Retainer $100K/yr
[#13] Retainer and readiness costs for on-call hazmat/structural/welding/EOD specialists able to operate metal-free tools.
Structural Repair Contingency $100K/yr
[#20] Annual set-aside for rapid repairs/sealing after local damage to containment caused by tearing.
Administrative Overhead $100K/yr
[#28] Administrative overhead, accounting and record-keeping assigned to SCP operations (approx. program overhead).
Cover Story And Legal $30K/yr
[#26] Legal, vendor contracts, NDAs and liaison costs to procure special suppliers and manage liabilities.
Metal Exclusion Audits $30K/yr
[#5] Annual metal-exclusion surveys and audits to detect newly introduced metal and verify mitigations.
Inventory Control And Tracking $25K/yr
[#16] Administrative overhead, scanning and tagging program to track metal assets near containment.
Storage And Cataloguing $20K/yr
[#18] Secure cataloguing and long-term storage or quarantine of produced copies/scrap metals.
Recycling And Disposal $20K/yr
[#19] Annual recycling/disposal vendor contracts and per-event hazardous waste handling (average).
Cybersecurity $20K/yr
[#23] Hardening and audits of facility control systems to prevent accidental triggering or robot/automation interaction.
Medical Surveillance $15K/yr
[#24] Ongoing occupational health monitoring for staff exposed to SCP's EM/neural emissions.
Facilities Maintenance $10K/yr
[#6] Ongoing maintenance of isolation hardware, chamber upkeep and small repairs to containment infrastructure.
Supplies And Consumables $10K/yr
[#15] Non-metallic PPE, replacement PTFE seals/liners and routine consumables.
Incident Drills $10K/yr
[#27] Budget for red-team testing and simulated breach exercises including staff time and materials.
Training Annual $6K/yr
[#14] Annual refresher training and periodic drills.
Logistics And Transport $5K/yr
[#22] Per-transport event expenses and logistics for occasional moves (per-year average).
Retrieval Event Consumables $5K/yr
[#10] Energy, consumables and disposal costs averaged per retrieval event (pro rata annual expectation).
Periodic Replacement $5K/yr
[#30] Pro rata annual cost for periodic replacement of PTFE linings and composite panels (wear-and-tear schedules).
Monitoring Maintenance $3K/yr
[#7] Annual storage, maintenance and calibration for galvanically-isolated monitoring equipment.
Cost Scenarios
📊 Baseline (baseline) $2.6M/yr
91.0% probability / year
Normal year with routine operations, audits, research and reserves funded; no containment incidents beyond expected maintenance.
no replication beyond immediate containment regular audits and planned research
🚨 Minor Incident $2.8M/yr
8.0% probability / year +$200K vs baseline
Localized replication or retrieval event requiring emergency response, localized structural repair, extra recycling/disposal and overtime.
small-scale replication requiring melting/retrieval limited containment damage and cleanup
🚨 Major Breach $5.1M/yr
1.0% probability / year +$2.5M vs baseline
SCP reaches multi-figure/two-meter stage and breaches inner containment causing significant structural damage, public exposure risk and large-scale mitigation.
assembly to 2 m scale breach of inner chamber and exposure to external infrastructure
👥 Personnel 4 total
Role Count Notes
Research Scientist 1 [#12] Principal researcher responsible for operations and approvals.
Technician 1 [#12] Technician for routine checks, experiments and handling under non-metallic protocols.
Security Officer / MTF Agent 2 [#12] Site guards assigned to containment area (rotational coverage assumed in wages).
📋 Confidence Notes
Line items and cost ranges are well-specified in analyst notes (construction, equipment and operational needs), but large uncertainties remain around incident frequency, scale of reserves used in a breach, and multi-year replacement/contingency sizing, so confidence is medium.
← SCP-067 ↑ All SCPs SCP-069 →