SCP-084
Euclid
~
medium confidence
SCP-084
Expected annual
$5.2M
One-time setup
$6.8M
Annual recurring
$5.2M
Personnel
41
Estimated upfront capital is approximately $6.75M, with annual operating costs around $5.16M; the main recurring drivers are continuous security/SRT wages, research/monitoring staff, and readiness/logistics (aircraft, vehicles, maintenance).
One-Time Capital Costs
Total: $6.8M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal year with continuous watch, routine maintenance, and scheduled research/monitoring only.
steady_state_containment
routine_maintenance
🚨
Minor Incident
$5.4M/yr
Localized event requiring SRT recall, overtime, limited equipment replacement, extra medical response and PR/amnestic usage.
sentry_recall
small_public_exposure
limited_equipment_damage
🚨
Major Breach
$7.2M/yr
Significant containment compromise requiring extended SRT deployment, helicopter hours, sensor replacement, larger amnestic operations and temporary surge staffing.
extended_SRT_deployment
air_support_and_repair
large_amnestic_operations
🚨
Catastrophic Breach
$13.2M/yr
Large-scale containment failure or public exposure requiring full contingency operations, mass amnestics, military-grade response and major remediation.
mass_exposure
full_recontainment_ops
public_evacuations
Personnel
41 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | [#7] Continuous 24/7 guard coverage across shifts, supervisors included in this count. |
| Special Response Team (SRT) Operator | 8 | [#8] On-call rapid reaction team (6–12 operators; midpoint used). |
| Medical Officer | 2 | [#9] On-site/on-call medics and basic medical staffing for casualty response and amnestic administration. |
| Research Scientist / Analyst | 4 | [#13, #20] Off-site and remote analysts supporting monitoring and research efforts; staff reflected in research/monitoring operating costs. |
| Engineer / Maintenance | 2 | [#2, #6, #26] Responsible for roads, generators, vehicles and periodic equipment replacement. |
| Administrative Staff | 4 | [#25] Program managers, logistics coordinators, and legal/HR support included in administrative overhead. |
| Site Director / Executive Staff | 1 | [#5, #25] Single site/program director responsible for operations and O5 liaison. |
Confidence Notes
Notes provide detailed line items and ranges, allowing mid-range estimates; however the anomalous nature and rare high-cost events introduce uncertainty, so confidence is medium.