SCP-088
Safe
~
medium confidence
SCP-088
Expected annual
$3.5M
One-time setup
$6.2M
Annual recurring
$3.5M
Personnel
11
Upfront capital for containment construction, custom acrylic case, robotics and lab equipment is substantial (~$6.2M in this estimate) while annual operating costs are dominated by staff wages, contracted BSL‑4 access and administrative/monitoring overhead (baseline ~$3.46M/yr). Main drivers are BSL requirements, specialist staff/security, and contingency/reserve funding.
One-Time Capital Costs
Total: $6.2M
Annual Recurring Costs
Total: $3.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.5M/yr
Normal year with no major containment incidents; recurring operations, contracted BSL-4 access, routine maintenance and staffing.
no breach
routine maintenance
scheduled research activities
🚨
Minor Incident
$3.7M/yr
Localized containment failure or small secretion leak requiring repairs, targeted medical screening, and PR mitigation.
seal degradation
small leakage of corrosive secretion
limited personnel exposure
🚨
Major Breach
$6.0M/yr
Significant containment breach with multiple exposures, quarantine, large-scale remediation, possible facility lockdown and decontamination.
full seal failure
multiple personnel mutations/exposures
facility decontamination & rebuild
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#10] 24/7 coverage: 6guards (3 shifts) as baseline staffing used in wage calculations. |
| Research Scientist | 3 | [#11] PI + 2 researchers (senior PI and two containment/biochem researchers). |
| Technician | 2 | [#11] 2 technicians for daily maintenance, sampling support, and equipment operation. |
Confidence Notes
Many major items (containment case, room buildout, robotics, BSL-4 choice) have large ranges; historical behavior gives some guidance but the need for BSL-4 build vs contract access is a major driver of uncertainty.