SCP-090
Keter
~
medium confidence
SCP-090
Expected annual
$15.0M
One-time setup
$33.2M
Annual recurring
$14.3M
Personnel
39
Estimated one-time setup costs are approximately $33.2M, driven by hardened vault construction, Class-OT compute/storage and initial research/imaging systems; recurring costs are roughly $14.3M/yr dominated by staffing, ongoing research, compute/storage operations and legal/cover operations.
One-Time Capital Costs
Total: $33.2M
Annual Recurring Costs
Total: $14.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.3M/yr
Normal operational year with continuous monitoring, routine experiments, and no major incidents or breaches.
routine_monitoring
scheduled_maintenance
controlled_testing
🚨
Minor Incident
$15.8M/yr
Localized incident or alignment-driven event causing evacuation, emergency response, limited equipment damage, increased legal/PR activity and short-term research surge.
localized_alignment_event
temporary_evacuations
emergency_response_activation
🚨
Catastrophic Breach
$39.3M/yr
Major containment breach or alignment sequence that requires national-level response, extended evacuation, large-scale remediation and draws on contingency reserves.
major_alignment_sequence
containment_failure
national_emergency_response
Personnel
39 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Operators | 10 | [#11] 24/7 human monitoring operators across three shifts (9–12 recommended); midpoint staffing used. |
| Security Officer / AXA-Level Agents | 16 | [#12] Full-time armed security team (12–20 recommended); includes rapid reaction and perimeter operations. |
| Research Scientist / Analysts | 9 | [#13] Senior research staff, anomaly specialists and computational modelers (6–12 recommended). |
| Engineer / Maintenance | 4 | [#14] Containment engineers and maintenance technicians (3–6 recommended) responsible for vault, imaging rigs, power and environmental systems. |
Confidence Notes
Estimates are based on analyst ranges supplied in notes; many line items have wide ranges (especially contingency reserve, compute/storage and specialized research). Known technical requirements (continuous imaging, Class-OT compute, hardened vault) give medium confidence in structural and recurring categories, but catastrophic scenario costs and exact contingency sizing remain uncertain.