SCP-094
Keter
~
medium confidence
SCP-094
Expected annual
$17.9M
One-time setup
$30.4M
Annual recurring
$17.8M
Personnel
74
Estimated one-time capital costs of $30,380,000 driven by site acquisition, construction, lab/R&D seed and contingency reserves; recurring annual costs of $17,620,000 driven primarily by staff wages, long-term R&D, security/military liaison, and facility operations.
One-Time Capital Costs
Total: $30.4M
Annual Recurring Costs
Total: $17.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$17.8M/yr
Normal year with no major incidents; routine operations, research, maintenance and reserve contributions.
routine_operations
scheduled_research
no_breach
🚨
Minor Incident
$18.1M/yr
Localized incident (equipment damage, small containment repair, limited exposure control) requiring emergency response and modest repairs.
equipment_failure
small_containment_damage
limited_personnel_injury
🚨
Major Breach
$42.6M/yr
Significant containment breach or public exposure requiring large-scale emergency funds, legal/diplomatic mitigation, rebuilds and international response.
containment_breach
public_exposure
catastrophic_equipment_loss
Personnel
74 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 40 | [#7] Approximately 30–60 security personnel (three shifts); assumed 40 on-site to cover shifts and supervisors (fully-burdened). |
| Research Scientist | 15 | [#11] Senior scientists for physics/acoustics/materials; part of core research team. |
| Lab Technician | 8 | [#11, #12] Technicians supporting experiments, instrumentation and monitoring. |
| Administrative Staff | 4 | [#30] Procurement, classified finance, and site administration. |
| Medical Officer | 2 | [#10] On-site med staff for immediate response and rotation health monitoring. |
| Engineer / Maintenance | 4 | [#5, #6, #20] Facility engineers for power, HVAC, vehicles and containment maintenance. |
| Site Director / Executive Staff | 1 | [#30] Site leadership and liaison executive. |
Confidence Notes
Analyst notes provide detailed line-item ranges but long-term growth, geopolitical liaison complexity, and uncertain experimental cadence introduce meaningful uncertainty — estimates are mid-range choices within provided bounds.