SCP-1023
Safe
~
medium confidence
SCP-1023
Expected annual
$639K
One-time setup
$99K
Annual recurring
$615K
Personnel
7
One-time setup costs are modest (~$99k) for containment, equipment, and initial analyses; baseline annual operating costs are ~ $615k driven primarily by staffing, legal/overhead reserves, and ongoing research/monitoring. Contingent mitigation or public-cover operations can raise costs into the hundreds of thousands to multi-millions in an event year.
One-Time Capital Costs
Total: $99K
Annual Recurring Costs
Total: $615K/yr
Cost Scenarios
📊
Baseline
(baseline)
$615K/yr
Normal year with routine monitoring, maintenance, and no major activations or public mitigation actions.
routine_monitoring
scheduled_testing
no_significant_predictions
🚨
Minor Incident
$630K/yr
Localized activation or false-positive requiring overtime, incident investigation, and short-term increased staffing/equipment use.
false_positive_activation
localized_device_activity
🚨
Mitigation Response
$1.1M/yr
Foundation elects to act on a significant prediction (targeted evacuations, official coordination, and expanded cover-story/legal actions).
actionable_prediction
targeted_evacuations
expanded_public_coordination
🚨
Catastrophic Mitigation
$3.1M/yr
Large-scale mitigation or public deception effort (multi-site evacuations, infrastructure shoring, major coverups) requiring multi-million dollar intervention.
mass_prediction
multi-city_evacuations
nation-scale_public_intervention
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Technician | 3 | [#7] 24/7 coverage requires ~3 FTE to monitor audio/video and instrument status. |
| Research Scientist / Lab Lead | 1 | [#8] Lab lead allocated at ~0.2 FTE but counted as one personnel with responsibilities for analysis and oversight. |
| Research Technician | 1 | [#8] Technician allocation ~0.5 FTE dedicated to testing and maintenance. |
| Data Analyst | 1 | [#8] Data analyst allocation ~0.5 FTE for log analysis and correlation studies. |
| Senior Researcher / On-call | 1 | [#9] Senior Researcher maintained on-call for activations and rapid response. |
Confidence Notes
Line-item cost ranges in the analyst notes are clear for equipment and staffing, but contingency/mitigation items are highly scenario-dependent with wide variability; therefore aggregate and contingency estimates are medium confidence.