SCP-1084
Euclid
~
medium confidence
SCP-1084
Expected annual
$1.4M
One-time setup
$2.3M
Annual recurring
$1.4M
Personnel
16
Estimated one-time containment and setup costs are approximately $2.32M driven by land acquisition, site construction, and initial memetic R&D; ongoing annual operations are about $1.40M driven primarily by staff wages, research/monitoring, and cover-story/legal overhead.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal operational year with routine monitoring, maintenance, and scheduled research activities.
no breaches
scheduled research and observation
🚨
Minor Incident
$1.5M/yr
Limited containment incident (medical emergency, small breach, localized equipment damage) requiring overtime, temporary lockdown, and limited repairs.
small containment breach
medical evacuation
limited equipment replacement
🚨
Major Breach
$2.0M/yr
Significant containment breach requiring MTF deployment, extended operations, specialist research surge, legal action, and refurbishment.
mausoleum disturbance
widespread exposure of townspeople
large-scale recovery operation
🚨
Political Exposure
$1.7M/yr
Local or international exposure of the site/cover story leading to heavy legal, PR, and relocation costs.
media investigation
government inquiries
descendant claims/public lawsuits
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#14] 24/7 guard rotations (10 guards estimated to maintain continuous shifts). |
| Research Scientist | 3 | [#15] Field researchers for forensic, chemical, and memetic studies (2–3 recommended; 3 used here). |
| Site Director / Executive Staff | 1 | [#15] Single site director to manage operations and liaison with authorities. |
| Medical Officer | 1 | [#15, #18] On-site medic/paramedic to provide care and manage SCP-1084-1 welfare. |
| Memetics / Cognitive Specialist | 1 | [#15, #31] Specialist for memetic safety protocols and countermeasure development. |
Confidence Notes
Notes provide detailed line items and realistic ranges, but many cost ranges are broad and site-specific variables (local construction costs, land price variability, and memetic R&D uncertainty) reduce precision.