SCP-1091
Euclid
~
medium confidence
SCP-1091
Expected annual
$3.2M
One-time setup
$3.3M
Annual recurring
$2.5M
Personnel
19
Initial setup costs are approximately $3.33M driven by facility hardening, specialized equipment, and establishing a contingency reserve; annual baseline operating costs are approximately $2.53M driven by security staffing, ongoing monitoring/research, and facility maintenance.
One-Time Capital Costs
Total: $3.3M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Normal year with no major incidents; routine monitoring, maintenance, research, and staffing costs only.
no_transfers_outside_containment
routine_operations
🚨
Minor Incident
$3.5M/yr
Single-device transfer detected and localized; MTF deployment and limited recall/destruction within a localized area with modest compensation/legal work.
localized_transfer
single recall operation
🚨
Major Recall Operation
$7.5M/yr
Large urban recall/search operation with substantial property compensation, extended MTF deployment and significant legal/PR costs.
widespread_transfer
urban recall and compensation
🚨
Infrastructure Compromise
$502.5M/yr
SCP-1091 impacts major broadcast or telecom infrastructure requiring national-level responses, shutdowns, and massive economic remediation.
backbone_infection
nation-scale containment
Personnel
19 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#4] Twelve FTE armed guards to maintain three-person posts continuously (12 FTE covers rotation/vacation). |
| Security Supervisor / Manager | 1 | [#4] Supervisor/manager for the guard contingent and site security operations. |
| Research Scientist | 2 | [#11] Senior researchers and RF engineers for ongoing R&D and countermeasure development. |
| Signal Analyst / Research Technician | 2 | [#3, #18] Analysts for continuous audio/digital-mode decoding, forensic review, and translation. |
| Engineer / Maintenance | 1 | [#7, #14, #15] Technician/engineer responsible for RF monitoring nodes, generator/UPS, HVAC, and Faraday maintenance coordination. |
| Administrative Staff | 1 | [#25] Administrative/site coordination and liaison for legal/PR and contractor management. |
Confidence Notes
Analyst notes provide detailed line-item ranges enabling midpoint estimates, but large ranges on recall/compensation and low-probability infrastructure failures produce moderate uncertainty.