SCP-1116
Euclid
~
medium confidence
SCP-1116
Expected annual
$4.6M
One-time setup
$4.4M
Annual recurring
$4.6M
Personnel
20
Estimated first-year one-time costs are approximately $4.36M driven by shielded cells, RF jammers, and installed monitoring equipment; recurring annual costs are ~ $4.58M driven primarily by specialized staff wages, legal/contingency reserves, and maintenance.
One-Time Capital Costs
Total: $4.4M
Annual Recurring Costs
Total: $4.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.6M/yr
Normal uneventful year with routine monitoring, maintenance, and staffing; no containment incidents.
routine_operations
scheduled_maintenance
regular_research_activity
🚨
Minor Incident
$4.9M/yr
Localized incident requiring emergency repairs, overtime, targeted forensic analysis, and limited external contractor support (no full breach).
partial_shield_leak
localized_equipment_failure
targeted_external_analysis
🚨
Major Breach
$8.1M/yr
Full containment breach or large-scale security incident requiring extensive emergency response, replacement of infrastructure, legal exposure, and public mitigation.
containment_breach
unauthorized_wireless_exposure
major_equipment_destruction
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Signal Analyst / RF Engineer / Cryptographer | 4 | [#10] Full-time specialists for signal monitoring, cryptanalysis, and RF engineering required to analyze outbound transmissions. |
| Medical Officer | 1 | [#12] On-call physician for specimen care and medical oversight. |
| Biomedical Technician | 1 | [#12] Biomedical tech for specimen care, sample collection and basic lab support. |
| Research Scientist | 3 | [#14] Biologists/materials scientists/neuroscientists leading research into physiology, implanted mesh, and RF interactions. |
| Lab Technician | 3 | [#14] Lab techs supporting materials analysis, sample prep, and routine experiments. |
| Security Officer / MTF Agent | 8 | [#15] Dedicated containment/security personnel for cell doors, transport teams, and on-site response (rotating shifts). |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing mid-range estimates, but several cost drivers (jammer kW requirement, legal/regulatory exposure, and contingency reserve sizing) are highly uncertain, producing moderate confidence.