SCP-1124
Keter
?
low confidence
SCP-1124
Expected annual
$41.3M
One-time setup
$1.3B
Annual recurring
$41.1M
Personnel
55
Total one-time buildout and contingency fund costs are approximately $1.33B driven by deep-underground construction, interplanetary mission hardware, and large contingency/reserve funds; recurring annual costs are ~ $41.07M driven by facility operations, security staffing, insurance/legal provisioning and R&D/monitoring.
One-Time Capital Costs
Total: $1.3B
Annual Recurring Costs
Total: $41.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$41.1M/yr
Normal uneventful year with routine operations, maintenance, staffing and planned R&D.
routine_operations
scheduled_relining
planned_R&D
🚨
Minor Incident
$41.6M/yr
Small contained incident requiring emergency termination of a single chamber, limited cleanup and replacement of liners/equipment.
localized_containment_failure
single-chamber_incineration
equipment_replacement
🚨
Major Breach
$66.1M/yr
Significant containment failure requiring full-scale cleanup, partial demolition and rebuild of affected facilities and large remediation effort.
multiple-systems_failure
structural_breach
large-scale_contamination
🚨
Political Exposure
$91.1M/yr
Public/political exposure leading to litigation, heavy PR/legal costs, potential payouts and program interruption.
information_leak
media_exposure
government_inquiry
Personnel
55 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 40 | [#12] 24/7 armed guard and rapid-response complement; headcount calibrated to the security payroll portion of staff_wages. |
| Containment Technician / Maintenance | 8 | [#13] Technicians performing monthly relining, acid handling, robotics maintenance; included in staff_wages. |
| Research Scientist | 7 | [#14] Senior researchers and supporting research staff requiring special clearances; included in staff_wages. |
Confidence Notes
Many core brief requirements are technically or politically infeasible (70 km underground site, on-site nuclear failsafe, large-volume triflic acid protocols). Cost ranges are broad and several items are modeled by proxy; therefore estimates have low confidence.