Expected annual
$13.1M
One-time setup
$432.8M
Annual recurring
$11.0M
Personnel
44
First-year one-time costs are dominated by construction, specialized containment equipment, and very large contingency/reserve funds resulting in a multi-hundred-million-dollar setup. Annual recurring costs are driven primarily by radioactive waste shipping, security/personnel, monitoring and long-term stewardship, totaling roughly $11M/yr.
One-Time Capital Costs
Total: $432.8M
Annual Recurring Costs
Total: $11.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.0M/yr
Normal operation year with scheduled water changes, routine monitoring, staffing and two waste shipments; no containment incidents.
scheduled_water_changes
routine_maintenance
no_incident
🚨
Minor Incident
$13.0M/yr
Localized contamination event or operational failure requiring additional cleanup, emergency response, and extra waste processing but no structural demolition.
lamp_or_power_failure
small_plumbing_leak
localized_surface_activation
🚨
Major Breach
$61.0M/yr
Significant activation/contamination event requiring extended remediation, replacement of contaminated chamber components and major operational disruption.
partial_active_state_path_contamination
extended_cleanup_and_demolition_of_components
🚨
Catastrophic Breach
$261.0M/yr
Full active-state disaster with large-scale contamination, mass casualties and demolition/relocation costs requiring catastrophic fund deployment.
uncontrolled_activation
mass_casualties
site_demolition_and_large_scale_cleanup
Personnel
44 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 35 | [#13] 24/7 security coverage (three shifts plus supervisors), 30–40 FTEs assumed for the wage budget (~$2M/yr). |
| Site Director / Executive Staff | 1 | [#25] Executive oversight and liaison for containment and compliance. |
| Administrative Staff | 2 | [#25] HR, accounting, scheduling and administrative support for operations and Class-D program. |
| Engineer / Maintenance | 2 | [#7, #20] HVAC, structural, generator and remote systems maintenance. |
| Research Scientist | 1 | [#25] Level 4 oversight/technical lead for containment procedures and any approved testing. |
| Medical Officer | 1 | [#14, #18] Radiation medicine and emergency medical readiness. |
| Technician / Radiation Monitoring | 2 | [#6, #16] Sensor network operation, calibration, environmental sampling and equipment servicing. |
Confidence Notes
Line-item estimates are based on analyst-provided ranges and conservative midpoints; primary uncertainty stems from regulatory/disposal regime variability and low-frequency catastrophic scenarios, which introduce large swings.