SCP-1179
Keter
~
medium confidence
SCP-1179
Expected annual
$27.9M
One-time setup
$343.2M
Annual recurring
$24.8M
Personnel
65
Initial capital and contingency commitments are large (~$318.3M one-time) driven by relocation, contingency reserves, tactical readiness, and a neutralization contingency; ongoing operations and monitoring cost roughly $24.8M per year, dominated by personnel, tactical-readiness security, and specialized monitoring/research.
One-Time Capital Costs
Total: $343.2M
Annual Recurring Costs
Total: $24.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$24.8M/yr
Normal operational year with no major incidents; routine monitoring, staff wages, and scheduled maintenance.
routine_monitoring
staffing_and_maintenance
🚨
Minor Incident
$26.8M/yr
Localized incident such as a sinkhole, short-term unusual gas release, or small collapse requiring emergency response, temporary evacuations, and increased monitoring.
localized_gas_release
sinkhole
temporary_evacuations
🚨
Major Remediation
$99.8M/yr
Significant subsurface migration, contamination spread, or structural collapse requiring large-scale remediation, mass evacuations, and extended legal/compensation costs.
widespread_contamination
structural_collapse
mass_evacuations
🚨
Neutralization Campaign
$324.8M/yr
Decision to attempt active neutralization (extended conventional campaign or escalation toward low-yield nuclear option), causing very large single-year expenditures for heavy ops, evacuation, environmental mitigation, and multi-agency support.
active_neutralization
conventional_campaign
nuclear_option_considered
Personnel
65 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#5] 24/7 perimeter and internal security staffing (includes specialized training, supervisors and overtime costs). |
| Rapid Response / Field Operative | 15 | [#6] On-call expeditionary teams for incident response, vehicle crews and technical rigs. |
| Research Scientist | 20 | [#14] Project Tartarus multidisciplinary research team (geologists, volcanologists, physicists, engineers, technicians) and program overhead. |
Confidence Notes
Estimates are based on analyst note ranges and programmatic assumptions; one-time contingency items (neutralization, insurance, relocation) and political choices dominate uncertainty, so totals are approximate but grounded in provided ranges.