SCP-1196
Safe
~
medium confidence
SCP-1196
Expected annual
$1.5M
One-time setup
$1.2M
Annual recurring
$1.5M
Personnel
11
One-time setup (purchase + retrofit) is estimated at approximately $1.21M; recurring annual costs are approximately $1.48M, driven primarily by security staff wages, legal/cover/insurance, and medical/contracted response. Major cost drivers are the decision to purchase property versus lease and the scale of legal/cover retainer and medical liability budgets.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Uneventful year with normal operations, routine testing under controls, no fatalities or major exposures.
routine_operations
scheduled_testing
no_major_incident
🚨
Minor Incident
$1.6M/yr
Limited incident: a subject exceeds safe exposure threshold resulting in injury, localized damage, medical response, small repairs and legal/administrative overhead.
subject_injury
localized_property_damage
short-term_medical_response
🚨
Major Breach
$2.1M/yr
Serious event: fatality or public exposure requiring autopsy, litigation, PR/legal retainers, major repairs and potential temporary relocation.
fatality
public_exposure
forced_recontainment_or_relocation
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | 2 per shift, 3-shift coverage; salary+benefits/overtime budgeted into staff_wages (~$300k total). |
| Site Director / Executive Staff | 1 | Level-3+ authorized director, on-call; salary included (~$140k median). |
| Administrative Staff | 1 | Front-business/admin to support cover story and record-keeping; salary included (~$50k). |
| Research Scientist | 2 | Two researchers conducting tests, audio/behavior analysis; wages included in research team (~part of $260k total for research team). |
| Engineer / Technician | 1 | Technical support for monitoring systems, evidence handling, and experiment setup; included in research team wages. |
Confidence Notes
Estimates use midpoints of analyst ranges and map all enumerated line items; however major decision variables (purchase vs lease, scale of legal/insurance expenditures, and frequency of human testing) create substantial uncertainty, so confidence is medium.