SCP-122
Thaumiel
~
medium confidence
SCP-122
Expected annual
$1.1M
One-time setup
$993K
Annual recurring
$1.1M
Personnel
4
One-time setup costs are moderate (~$1.0M seed including contingency) driven by containment buildout, redundant power and emergency readiness; recurring annual costs are substantial (~$1.11M/year) driven primarily by staff wages, clinical use, legal/cover operations, research and monitoring.
One-Time Capital Costs
Total: $993K
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal, uneventful year with routine maintenance, staffing, research and monitoring; no major power failures or public exposure events.
no major incidents
routine maintenance & staffing
🚨
Minor Incident
$1.2M/yr
Localized equipment failure or brief extended outage requiring mobile generator deployment, emergency repairs and modest PR/legal response.
short power outage
equipment failure requiring vendor deployment
🚨
Major Breach
$1.8M/yr
Significant power-failure or containment-impact event causing unpowered state, loss or harm to SCP-122-1, large legal/PR exposure and large contingency deployments.
site-wide blackout or catastrophic power failure
public detection requiring large-scale cover/legal response
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Monitoring Personnel / Technician | 1 | [#10] One dedicated or primary on-call FTE to monitor feeds/alerts and respond to flicker events; salary included in staff_wages. |
| Clinical / Psychologist | 1 | [#13] Clinical staff (therapist/psychologist) to run daily sessions and recordkeeping; aggregated salary included in staff_wages. |
| SCP-122-1 (Resident Subject) / Paid Stipend | 1 | [#14] Housing, medical care and stipend/salary for SCP-122-1 resident treated as recurring personnel cost. |
| Security Officer (incremental) | 1 | [#17] Incremental security staffing dedicated to containment room/site (1 FTE equivalent incremental cost included in staff_wages). |
Confidence Notes
Analyst notes provide line-item ranges and clear drivers but contain wide ranges and uncertain event frequencies (replacement-subject cadence, likelihood of major unpowered events); midpoints used for estimates so overall confidence is medium.