SCP-1235
Euclid
~
medium confidence
SCP-1235
Expected annual
$4.9M
One-time setup
$114.9M
Annual recurring
$4.6M
Personnel
34
One-time setup and contingency reserves dominate costs (~$115M one-time), with recurring annual operations driven primarily by personnel, ongoing research/monitoring, and medical/incident readiness (~$4.58M/yr). Major cost drivers are the catastrophic contingency reserve, personnel, and specialized research/remote-operation equipment and data infrastructure.
One-Time Capital Costs
Total: $114.9M
Annual Recurring Costs
Total: $4.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.6M/yr
Normal operational year with routine maintenance, staffing, and scheduled research; no major incidents or breaches.
routine_operations
scheduled_research
no_breach
🚨
Minor Incident
$4.8M/yr
Localized incidents (personnel sensory injuries, small-scale microcosmic attacks, minor equipment damage) requiring medical treatment, small repairs and data recovery.
sensory_injury
localized_breach
minor_equipment_damage
🚨
Major Breach
$9.6M/yr
Significant containment breach requiring emergency contractors, substantial repairs/upgrades, extended research suspension and public containment measures.
sustained_microcosmic_offensive
facility_damage
extended_response_ops
🚨
Catastrophic Breach
$54.6M/yr
Large-scale escalation (multi-site risk, use/possession of radiological micro-weapons, potential XK-class implications) invoking major contingency and multi-agency response.
XK_escalation
national_response
destruction_or_removal_ops
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#10] 24 positions (three 8-person shifts) for continuous armed security and rapid-response capability. |
| Research Scientist | 6 | [#11] Full-time scientific staff including microscopists, physicists, materials scientists and humanities specialists. |
| Engineer / Maintenance / Technical Support | 4 | [#12] Lab technicians, IT administrators, and radiation safety officer for daily operations and calibration. |
Confidence Notes
Cost estimates are built from analyst-provided ranges and mid-point assumptions; personnel and recurring operating costs are well-constrained, but large contingency and catastrophic reserves are highly uncertain and drive most variance.