SCP-1245
Euclid
~
medium confidence
SCP-1245
Expected annual
$18.1M
One-time setup
$29.1M
Annual recurring
$18.0M
Personnel
126
One-time capital/setup costs are ~29.1M driven by harbor civil works, vessel acquisition/refit, heavy equipment and lab outfitting; recurring annual costs are ~18.0M driven by ship and crew operations, MTF rotations, security wages, and ongoing research/monitoring.
One-Time Capital Costs
Total: $29.1M
Annual Recurring Costs
Total: $18.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$18.0M/yr
Normal operational year with no major containment incidents; routine maintenance, salaries, and research continue as planned.
routine_operations
weekly_inspections
scheduled_maintenance
🚨
Minor Incident
$18.8M/yr
Localized failure (partial chain/anchor damage or small hull breach) requiring emergency repairs, extra salvage, and overtime.
partial_anchor_failure
localized_hull_damage
equipment_failure
🚨
Major Breach
$21.0M/yr
Significant containment breach or structural failure of mooring requiring heavy-lift mobilization, major repairs, and extended salvage operations.
multiple_anchor_failures
large_scale_hull_breach
MTF_engagement_for_recontainment
🚨
Catastrophic Breach
$26.0M/yr
Full containment failure leading to scuttling/salvage, public exposure risk, legal settlements and large-scale emergency response.
complete_mooring_failure
public_exposure
large_scale_salvage_and_scuttling
Personnel
126 total
| Role | Count | Notes |
|---|---|---|
| Ship Crew / Maritime Crew | 50 | Archimedes permanent crew and shipboard technical staff (covered in staff wages). |
| Security Officer / Port Guards | 30 | On-site 24/7 perimeter security, gate control, harbor patrol teams (covered in staff wages). |
| MTF Agent (Zeta-4) | 25 | Rotational specialized boarding/containment team personnel; staffing and OPEX included in staff wages. |
| Engineer / Maintenance | 12 | Site and vessel engineers, crane/operators, maintenance techs (salaries included in staff wages). |
| Medical Officer | 3 | On-site medics and trauma responders (salaries portion included in staff wages; medevac contract recorded separately). |
| Administrative Staff | 5 | Site administrative, logistics and liaison personnel (included in staff wages). |
| Site Director / Executive Staff | 1 | Senior site manager / director-level oversight (included in staff wages). |
Confidence Notes
Analyst notes provide a detailed itemization and ranges for most cost drivers, allowing midpoint-based estimates; nonetheless large environmental uncertainties (harbor size, vessel acquisition variability), anomalous behavior risk, and per-incident cost tails reduce confidence to medium.