SCP-128
Euclid
~
medium confidence
SCP-128
Expected annual
$4.8M
One-time setup
$5.8M
Annual recurring
$4.7M
Personnel
25
Initial capital costs are approximately $5.83M driven by reinforced chamber construction, heavy equipment (wheel, robotics, sensors) and a recommended contingency reserve; recurring annual costs are about $4.7M driven primarily by multi-shift personnel, research/monitoring, insurance/reserves and facilities operations.
One-Time Capital Costs
Total: $5.8M
Annual Recurring Costs
Total: $4.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.7M/yr
Normal uneventful operational year with routine maintenance, personnel costs, and scheduled research activity.
no incidents
scheduled maintenance
routine research
🚨
Minor Incident
$4.9M/yr
One or more small-scale incidents (localized projectile damage, foam deployment, forensic cleanup) requiring repairs and extra contractor support.
foam deployment
minor equipment replacement
limited medical/forensic response
🚨
Major Breach
$6.7M/yr
Significant containment failure or large-scale damage requiring major repairs, replacement of instrumentation, legal/PR response and large-scale mobilization.
structural breach
extensive equipment replacement
large-scale cleanup
🚨
Catastrophic Breach
$9.7M/yr
Catastrophic event requiring full rebuilding/upgrade, major shielding addition, long-term shutdown, and large contingency drawdown.
catastrophic structural failure
extreme unexpected physics-driven effects
major public exposure
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | Three-shift coverage for site security and on-site response per analyst note (#12). |
| Engineer / Maintenance (Technician) | 6 | Technicians for equipment, manipulators, HVAC, power systems and routine repairs (#12). |
| Research Scientist | 4 | Physicists/materials researchers to run experiments and analyze anomalous behavior (#12, #25, #18). |
| Monitoring / IT / Administrative Staff | 3 | Continuous monitoring operators, IT support, and administrative/chain-of-custody staff (#12, #6, #29). |
Confidence Notes
Line-item estimates are drawn directly from detailed analyst notes; ranges were midpointed and several contingency and incident-cost items are inherently uncertain due to anomalous physics and site-specific choices, so confidence is medium.