SCP-1319
Safe
✓
high confidence
SCP-1319
Expected annual
$592K
One-time setup
$242K
Annual recurring
$586K
Personnel
10
Up-front one-time containment and equipment costs are modest (~$241.5k) while annual recurring costs are dominated by personnel wages and administrative overhead (~$586.1k/yr). The main cost drivers are 24/7 security staffing, research personnel, and site overhead; contingency reserves and transport/diagnostic one-time purchases are secondary.
One-Time Capital Costs
Total: $242K
Annual Recurring Costs
Total: $586K/yr
Cost Scenarios
📊
Baseline
(baseline)
$586K/yr
Normal uneventful year with no incidents beyond routine operations and scheduled research.
normal operations
scheduled research
no containment incidents
🚨
Minor Incident
$601K/yr
Localized incident (e.g., accidental near-approach, small violent episode) requiring overtime, minor repairs, and limited amnestic administration.
accidental approach during transfer
staff procedural error
equipment failure (alarm/interlock)
🚨
Major Breach
$806K/yr
Significant containment breach or violent confrontation requiring emergency contractor response, large-scale amnestics, extended overtime, and possible disposition actions.
simultaneous proximity <3m causing large-scale violence
transportation accident during relocation
multiple-system failures or staffing breakdown
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] Two guards per shift across three shifts (6 guard-equivalents) to enforce separation and respond to incidents. |
| Research Scientist (Level-3) | 1 | [#5] Level-3 researcher required to authorize experiments and oversee protocols. |
| Research Assistant | 1 | [#5] Research assistant to perform daily tasks, interviews, enrichment, and protocol compliance. |
| Medical Officer | 1 | [#6] On-call site medic/EMT allocation (part-time coverage for containment). |
| Janitorial Staff | 1 | [#12] Part-time janitorial/cell-cleaning allocation for expelled food, odor control, and sanitation. |
Confidence Notes
Notes provide concrete line-item ranges and staffing requirements; estimates use midpoints of provided ranges and directly map to analyst line items. Remaining uncertainty is mainly in chosen midpoints for one-time capital and contingency sizing.