SCP-1340
Safe
~
medium confidence
SCP-1340
Expected annual
$5.0M
One-time setup
$16.1M
Annual recurring
$5.0M
Personnel
22
Initial capital expenditure is approximately $16.06M driven primarily by construction of a bespoke containment tank and major equipment/life‑support installations; ongoing annual operating costs are approximately $4.96M driven by specialized staff wages, utilities/energy, and a depreciation/capital replacement reserve.
One-Time Capital Costs
Total: $16.1M
Annual Recurring Costs
Total: $5.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.0M/yr
Normal uneventful year with steady operations, routine maintenance, and scheduled monitoring.
no major health crises
no containment incidents
standard field monitoring cadence
🚨
Minor Incident
$5.3M/yr
Localized animal health crisis or minor containment issue requiring surge staffing, emergency veterinary care, and extra consumables.
acute illness in multiple specimens
partial life‑support failure
emergency medical/surgical response
🚨
Major Breach
$7.5M/yr
Major containment breach, escape or large‑scale system failure requiring full remediation, replacement of major capital, extended field recapture, and legal/public relations response.
catastrophic tank failure
large‑scale escape
significant public exposure / regulatory action
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Elasmobranch Veterinarian / Lead Specialist | 4 | [#9] 3–5 FTE recommended; responsible for medical diagnostics, surgeries, and husbandry oversight. |
| Aquarist / Keeper | 6 | [#9] 4–8 keepers for 24/7 animal care, feeding, and enrichment. |
| Research Scientist / Electrical Engineer / Cryptanalyst / Linguist | 6 | [#10] 4–8 FTE mix to handle decoding/translation, signal processing, behavioral research, and data analysis. |
| Security Officer / MTF Agent | 6 | [#11] 4–8 guards for on‑site security, access control, and aquatic‑trained response. |
Confidence Notes
Analyst notes provide detailed line items and ranges for nearly all cost categories, enabling mid‑range estimates; uncertainty remains due to large ranges on capital items (tank/life‑support), operational staffing levels, and unpredictable field expedition frequency.