SCP-1373
Euclid
~
medium confidence
SCP-1373
Expected annual
$3.6M
One-time setup
$5.9M
Annual recurring
$2.8M
Personnel
10
Estimated one-time capital costs ~ $5.9M driven by vessels, lab upgrades, and specialized equipment; recurring annual operations ~ $2.78M driven by staff wages, logistics (vessels/inspections), energy, and contingency reserves.
One-Time Capital Costs
Total: $5.9M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Uneventful year: storage and study of deceased specimens, routine monitoring, regular maintenance, and minimal active deployments.
no live juvenile captures
no major hull-damage incidents
routine monitoring only
🚨
Active Search And Capture
$5.0M/yr
Sustained MTF deployments and vessel operations to locate/capture SCP-1373-07–16, increased maritime patrols and ROV operations.
confirmed live juvenile detections
increased hull-damage reports
ordered capture operations
🚨
Major Incident
$7.8M/yr
Large-scale breach/event causing multiple civilian injuries, extensive hull/system damage and major equipment loss requiring replacement and emergency response.
mass casualty event from laser strikes
major vessel hull breaches
significant equipment destruction
🚨
Research Scale Up
$3.8M/yr
Deliberate scale-up of R&D to identify/neutralize the gain medium and develop countermeasures; hiring specialists and commissioning custom apparatus.
prior incidents prompting large R&D investment
successful grant/priority to neutralize gain medium
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Lead Researcher | 3 | [#10] Lead researcher plus 2 supporting scientists for experimental work and sample oversight. |
| Marine Veterinarian / Technician | 1 | [#10] Veterinary care and animal husbandry for any live specimens. |
| Lab Technician / Research Assistant | 1 | [#7, #6] Hands-on sample prep, sequencing, histology and diagnostic instrument operation. |
| Security Officer / MTF Agent (onsite guards) | 4 | [#11] Onsite 24/7 guard coverage for refrigerators, tanks, and lab access (non-MTF deployment staffing). |
| Administrative Staff | 1 | [#25, #29] Administrative, records management, and coordination of legal/cover operations. |
Confidence Notes
Estimates use midpoint selections of wide analyst ranges and explicit scenario modeling; one-time capital needs (vessels, lab upgrades) are better-defined, but frequencies of deployments/incidents and long-term policy decisions (retain vs euthanize live juveniles) are uncertain, lowering confidence.