SCP-1375
Euclid
~
medium confidence
SCP-1375
Expected annual
$3.3M
One-time setup
$6.9M
Annual recurring
$3.0M
Personnel
18
Initial capital build-out is approximately $6.93M driven by airlock construction, specialized equipment (suits, robotics, HVAC, analytical instruments) and contingency reserves; ongoing annual operations are about $3.03M driven by staff wages, depreciation/reserve, and an ongoing astronomical search program.
One-Time Capital Costs
Total: $6.9M
Annual Recurring Costs
Total: $3.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.0M/yr
Normal, uneventful year with steady-state operations and scheduled research/activity only.
no_incident
routine_operations
🚨
Minor Incident
$3.3M/yr
Localized equipment or suit failure (pump/suit puncture) requiring repairs, overtime, and limited medical treatment; short operational downtime.
pump_failure
suit_breach
minor_decompression_event
🚨
Major Breach
$5.5M/yr
Catastrophic airlock or pressure-system failure causing major decompression, medical evacuations, structural repairs and possible public remediation.
airlock_catastrophic_failure
uncontrolled_decompression
contamination_spread
🚨
Research Breakthrough Requiring Scale Up
$5.0M/yr
Significant discovery triggers rapid scale-up: major telescope campaigns, additional high-end analyses, and expanded field operations.
astronomical_confirmation_needed
high-priority_follow-up_observations
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Senior Researcher | 2 | [#8] Senior oversight and approvals; required by containment procedures. |
| Research Scientist | 3 | [#8] Full-time researchers conducting analyses and observations. |
| Technician | 2 | [#8] Lab and equipment technicians for sample processing and maintenance. |
| Security Officer / MTF Agent | 7 | [#9] 24/7 site security in shifts; estimated 6–8 guards. |
| Medical Officer | 1 | [#7] Medic on-call trained for low-pressure/decompression injuries. |
| Engineer / Maintenance | 1 | [#3, #15] HVAC/pressure system and generator/UPS maintenance and emergency repairs. |
| IT / Systems Admin | 1 | [#16] Secure data management, communications and instrumentation telemetry. |
| Administrative Staff | 1 | [#18] Permits, scheduling, and administrative support for site operations. |
Confidence Notes
Analyst notes provide detailed line items and ranges for most categories, but uncertainty remains in contingency scenarios (BSL upgrade, long-range relocation), the scale of the astronomical program, and real-world costs in London Underground; ranges and contingencies drive medium confidence.