SCP-1384
Euclid
~
medium confidence
SCP-1384
Expected annual
$2.9M
One-time setup
$6.9M
Annual recurring
$2.7M
Personnel
21
One-time capital and site construction (shaft, lift, compound, surveillance and lab setup) are the largest upfront costs (~$6.9M). Recurring annual costs are driven by staff wages, security, monitoring/data storage, cover-story/legal, and reserves (~$2.7M/yr).
One-Time Capital Costs
Total: $6.9M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal operational year with weekly interactions, routine maintenance, no major incidents.
routine operations
weekly interaction and analysis
🚨
Minor Incident
$2.9M/yr
Localized incident (technical failure, minor structural damage, small unauthorized access) requiring targeted repairs, overtime and legal/PR response.
equipment failure
small breach or civilian interaction
🚨
Major Breach
$4.7M/yr
Significant containment breach or safety incident requiring large-scale mobilization, use of contingency reserves, temporary relocation/escalation measures.
major structural failure
significant civilian casualties/exposure
🚨
Catastrophic Exposure
$22.7M/yr
Large-scale public exposure or legal/financial fallout (mass disclosure, deaths, or major litigation) requiring massive settlements, PR, and possibly site demolition or relocation.
mass public exposure
major litigation/settlements
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 4 | Permanent researchers conducting weekly interactions and artifact study; maps to staff_wages [#10]. |
| Data Analyst | 2 | On-call analysts and log reviewers processing recordings and simulations; maps to staff_wages [#10]. |
| Site Manager / Executive Staff | 1 | Site manager responsible for day-to-day operations and liaison; maps to staff_wages [#10]. |
| Administrative Staff | 1 | Admin and logistics support for scheduling, permits and cover-story paperwork; maps to staff_wages [#10]. |
| Security Officer / MTF Agent | 10 | 24/7 perimeter security and rapid-response team (8–12 recommended); maps to staff_wages [#11]. |
| Medical Officer | 1 | On-site medic or contracted EMT coverage for weekly interactions and emergencies; maps to medical_staffing_and_contract [#14]. |
| Engineer / Maintenance | 1 | Maintenance for lift, generators, HVAC and site infrastructure; maps to facilities_maintenance [#4, #6]. |
| Sysadmin / IT | 1 | Manages secure servers, backups and data archives; maps to secure data storage recurring costs [#9]. |
Confidence Notes
Analyst notes provide detailed line items and ranges for construction and operations, enabling a reasoned estimate; however high uncertainty remains around incident/exposure magnitudes and contingency sizing, so confidence is medium.