SCP-1387
Euclid
~
medium confidence
SCP-1387
Expected annual
$15.4M
One-time setup
$50.3M
Annual recurring
$8.8M
Personnel
72
Initial one-time capital costs are approximately $50.33M driven by hangar construction and a $20M contingency reserve; recurring annual costs are about $8.75M driven primarily by personnel (security, surveillance, technical, and research) and ongoing facility/maintenance overhead.
One-Time Capital Costs
Total: $50.3M
Annual Recurring Costs
Total: $8.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.8M/yr
Normal operational year with no major incidents; routine maintenance, staffing, and scheduled operations only.
routine_operations
scheduled_clipping
no_breach
🚨
Minor Incident
$8.9M/yr
Localized containment incident requiring repairs, overtime, limited medical response, and temporary heightened security.
anchor_or_cable_damage
localized_breach_attempt
minor_structural_repair
🚨
Major Breach
$337.5M/yr
Containment failure that results in SCP-1387 reaching or interacting with a public airport requiring large-scale emergency response, cover-up operations, and major repairs or replacement of infrastructure.
containment_failure
public_exposure
airport_level_coverup
Personnel
72 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 36 | [#9] To maintain at least 10 on-site 24/7 requires ~36 personnel to cover shifts, leave, and backups; salaries included in staff_wages. |
| Surveillance Operator | 14 | [#8] Continuous 24/7 monitoring with 3 shifts × 4 operators + backups (~14 total); salaries included in staff_wages. |
| Engineer / Maintenance | 10 | [#10, #6, #21] On-site technical staff for anchors, HV systems, rigging and HVAC maintenance (~10 FTEs); salaries included in staff_wages. |
| Research Scientist / Technician | 10 | [#12, #13] Multi-disciplinary research team (anomalous biology, aerospace, perceptual studies); count chosen to match research salary pool. |
| Medical Officer | 2 | [#18] Medical/psych containment staff for recovered SCP-1387-1 care; staffing-levels reflected within the recurring care estimate. |
Confidence Notes
Estimates are based on analyst OOM numbers with midpoints used where ranges were given. Many line items (construction, covert ops, contingency usage) are location- and scenario-dependent, producing moderate uncertainty.