SCP-1391
Safe
~
medium confidence
SCP-1391
Expected annual
$2.5M
One-time setup
$2.3M
Annual recurring
$2.5M
Personnel
24
Initial capital outlay is approximately $2.27M driven by land acquisition, perimeter fencing, surveillance and heavy-lift equipment; recurring annual operations are roughly $2.46M driven by security/payroll, legal/cover costs, storage/IT and contingency reserves.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Normal year with routine operations, no major incidents or large-scale formations.
routine surveillance
scheduled maintenance
standard research activity
🚨
Minor Incident
$2.7M/yr
Moderate formation event requiring multiple crane/loader mobilizations, overtime for staff and increased contracted testing.
clustered new heads formation
frequent perimeter damage
small media attention
🚨
Major Breach
$3.5M/yr
Significant exposure or mass-formation event causing major legal action, broad media coverage, large-scale contractor deployments and settlements.
media leak
mass formation or public injuries
litigation or public inquiry
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent (Guards) | 16 | [#4, #5, #6] 16 guards to staff rotations/supervisors; wages and equipment costs accounted in staff_wages and equipment. |
| Video Monitoring / IT Operator | 4 | [#10, #9] ~3-6 FTE suggested for monitoring; 4 FTEs assumed for cost estimate and included in staff_wages. |
| Research Scientist / Technician | 4 | [#15, #16, #17, #28] Research team (archaeology/forensics/anthropology + technicians) to study stones and maintain databases; salaries included in staff_wages and lab setup in initial_research_and_lab_setup. |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a reasoned estimate, but uncertainties remain (buy vs rent decisions, frequency/scale of anomalous formations, and political/legal variability). That yields a medium confidence.