SCP-1396
Euclid
~
medium confidence
SCP-1396
Expected annual
$41.2M
One-time setup
$3.9B
Annual recurring
$32.5M
Personnel
37
One-time program setup and contingency/mission reserves dominate costs (approx. $3.94B one-time), while ongoing monitoring, personnel, and cooperative reimbursements drive annual costs (~$32.45M/yr). The largest risk is an occasional decision to fund a neutralization mission or large contingency payouts.
One-Time Capital Costs
Total: $3.9B
Annual Recurring Costs
Total: $32.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$32.5M/yr
Normal year: continuous monitoring, interagency liaison, and routine research with no major incidents or large expenditures.
routine monitoring
interagency cooperation
no disclosure
🚨
Minor Incident
$42.5M/yr
Localized leak or contractor disclosure requiring PR surge, targeted legal payouts and temporary covert actions.
small public leak
contractor data exposure
🚨
Major Breach
$232.4M/yr
Significant public disclosure or diplomatic crisis requiring major covert operations, large legal settlements and extensive international reimbursements.
widespread disclosure
diplomatic fallout
🚨
Neutralization Mission
$3.1B/yr
Decision to mount a full neutralization/retrieval mission to Jupiter L2 with associated launches and mission costs.
policy decision to neutralize
escalation of threat indicators
Personnel
37 total
| Role | Count | Notes |
|---|---|---|
| Program Manager / Administrative Staff | 8 | [#1] Program office personnel: program manager, ops lead, administrative and embedded security staff (6–10 FTE budgeted under #1). |
| Research Scientist | 20 | [#2] Scientific/technical staff for astrophysics, orbital mechanics and signal analysis (12–25 specialists, budgeted under #2). |
| Mission Operations / Technical Staff | 4 | [#3] Mission Operations Center operational personnel, SOC monitoring and physical operations staff (#3). |
| Signal Intelligence Analysts | 5 | [#7] Deep-space signal intelligence analysts and tool support staff (#7). |
Confidence Notes
Analyst notes provide detailed line items and ranges, but several major items (diplomatic buyouts, black-ops reserves, and a full neutralization mission) are highly uncertain and range over orders of magnitude; mid-level confidence reflects good coverage of cost categories but wide numerical uncertainty.