SCP-1400 Euclid ~ medium confidence
SCP-1400
Expected annual
$2.7M
One-time setup
$7.6M
Annual recurring
$2.7M
Personnel
3
One-time capital costs dominated by construction of the large reinforced containment volume and soundproof inner cell (~$6.9M), with annual operating costs driven by MTF readiness and continuous monitoring (~$2.68M/yr).
🏗️ One-Time Capital Costs Total: $7.6M
Facilities $6.9M
[#1, #2, #14] Structural construction & conversion of the 55×55×10 m reinforced containment chamber (#1), installation of the inner soundproofed cell and adjacent humanoid suite (#2), and soundproof HVAC/environmental control modifications installation (#14). Estimate combines selected mid-range values for site preparation and specialized install.
Equipment $680K
[#3, #5, #7, #8, #11, #12, #15, #21] High-resolution cameras and hardened NVR (#3), automated head-orientation software development (one-time component) (#5), level-4 access hardware (locks/biometrics) (#7), MTF initial equipment & kit (#8), initial Class-G amnestic stock (#11), PPE kit stockpile (#12), UPS/switchgear + generator hardware install (one-time equipment costs portion) (#15), and specialized non-audio sensors initial purchase/calibration (#21).
Initial Research And Lab Setup $80K
[#20] Initial research lab setup and specialized non-auditory experimental equipment for the research team (special sensors, calibration gear) as distinct from general equipment.
🔄 Annual Recurring Costs Total: $2.7M/yr
Logistics And Transport $900K/yr
[#8] MTF readiness and on-call staffing, training, baseline equipment ops and transport costs to enable rapid-response sweeps and captures (annual staffing & operations portion).
Research And Monitoring $423K/yr
[#4, #5, #20, #21] Continuous secure video storage & archival (#4), software updates & maintenance for head-orientation detection (#5), research team salaries and running costs for non-audio testing (#20), and calibration/maintenance of non-auditory sensors (#21).
Administrative Overhead $350K/yr
[#25] Administrative overhead (finance, HR, procurement) and site-level compliance allocation, set at ~15% of direct recurring costs in this estimate.
Staff Wages $320K/yr
[#6] 24/7 monitoring/watch officer staffing (3 FTEs) including benefits; chosen near mid-range of analyst estimates to cover continuous observation duties.
Contingency Reserve $200K/yr
[#18] Incident response contingency fund reserved for unexpected large costs (property damage, medical evacuation, litigation, major equipment loss).
Cover Story And Legal $100K/yr
[#17] Baseline retainer and routine cover-story/legal/public-relations work to manage civilian incidents, witness handling, and occasional legal fees.
It Security And Airgap $75K/yr
[#22] IT security, air-gap procedures, hardened networks, penetration testing and insider-threat monitoring to enforce the no-audio rule and prevent covert capture/leaks.
Replacement Upgrade Fund $75K/yr
[#26] Annualized budget for replacement/upgrades and R&D on mask-related mitigation technologies and containment improvements (reserve averaged from multi-year replacement cycles).
Forensic And Disposal $50K/yr
[#16] Annual budget for forensic processing, mortuary/cremation/interment and evidence handling when SCP-1400-A instances are disposed per protocol (recommended contingency).
Medical And Psychiatric Care $50K/yr
[#10] Ongoing medical and psychiatric care for SCP-1400-A (regular checkups, psychiatry, medication management) with special procedures to avoid audio exposure.
Training Programs $35K/yr
[#19] Recurring training and drills for cognitohazard recognition, emergency entry, MTF sweeps, and amnestic administration.
Facilities Maintenance $30K/yr
[#2, #14, #15] Ongoing maintenance of the inner soundproofed cell (#2), HVAC/filter and silencer servicing (#14), and UPS/generator maintenance & fuel provisioning (#15).
Supplies And Consumables $27K/yr
[#9, #11, #12, #23] Consumables for SCP-1400-A suite (food/medical) and custodial supplies (#9), Class-G amnestic replenishment & administration consumables (#11), PPE replacement and fit-testing supplies (#12), and routine waste/disposal/cleaning supplies & labor (#23).
Psychological Monitoring $25K/yr
[#24] Counseling, follow-up, and amnestic treatments for staff and affected civilians (SCP-1400-B exposures).
No Audio Policy Enforcement $15K/yr
[#13] Policy enforcement, periodic audits, staff training and compliance investigations to ensure prohibition on audio recording and unauthorized microphones.
Access Control Admin $5K/yr
[#7] Administrative and background-check costs associated with Level-4 supervisor access provisioning and occasional emergency overrides.
Cost Scenarios
📊 Baseline (baseline) $2.7M/yr
70.0% probability / year
Routine year with no major incidents; normal monitoring, MTF readiness, research, maintenance and overhead.
no major incidents standard monitoring and upkeep
🚨 Minor Incident $2.7M/yr
25.0% probability / year +$60K vs baseline
One or several small incidents (new SCP-1400-A selections, short MTF deployments, additional amnestic administrations, small disposal events) requiring modest extra spending.
single/small number of new targets additional MTF deployments and modest forensic/cover costs
🚨 Major Incident $3.2M/yr
5.0% probability / year +$500K vs baseline
Significant exposure or breach-like event requiring widescale response: large MTF mobilization, major legal/PR payouts, infrastructure repair, extended medical/public operations.
large-scale group violence or public exposure major structural damage or litigation
👥 Personnel 3 total
Role Count Notes
Monitoring / Watch Officer 3 Three FTEs to provide continuous 24/7 CCTV monitoring and event verification as specified in note #6; staffing costs are captured in staff_wages.
📋 Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a reasonable mid-range estimate; uncertainty remains around incident frequency, site-specific construction costs, and MTF staffing models, so confidence is medium.
← SCP-1399 ↑ All SCPs SCP-1401 →