SCP-143
Euclid
~
medium confidence
SCP-143
Expected annual
$7.3M
One-time setup
$17.1M
Annual recurring
$6.9M
Personnel
30
One-time capital costs of approximately $17.08M are driven by land acquisition, perimeter construction, decommissioning/relocation reserves and lab/furnace/machining buildouts; recurring annual costs are approximately $6.92M/yr driven largely by security staffing, R&D/lab operations, tooling/maintenance and an annual contingency reserve.
One-Time Capital Costs
Total: $17.1M
Annual Recurring Costs
Total: $6.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.9M/yr
Normal operational year with no major incidents; routine harvesting, maintenance, research and security operations continue as planned.
normal_operations
scheduled_research
routine_harvests
🚨
Minor Incident
$7.2M/yr
Localized incident such as sudden heavy shedding or wind event causing civilian exposure, injuries and extended cleanup/medevac operations.
sudden_wind_shedding
localized_civilian_exposure
extended_cleanup
🚨
Major Breach
$9.4M/yr
Significant containment breach, theft attempt, mass exposure or forced disclosure requiring large emergency response, legal actions, and potential relocation/decommissioning activity.
coordinated_theft_attempt
large_scale_exposure
forced_disclosure
🚨
Research Breakthrough Requiring Scale Up
$9.9M/yr
Discovery or policy decision to aggressively pursue weaponization/industrialization requiring rapid scale-up of R&D, capital purchases and staffing.
promising_material_applications
executive_decision_to_scale
expanded_prototyping
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#4] 24/7 on-site guards and rapid-response team; mid-range staffing (midpoint of 12–24 FTEs). |
| Research Scientist | 4 | [#27, #21] Scientists leading materials research and prototype development included in long-term staffing budget. |
| Technician / Lab Tech | 4 | [#13, #16] Laboratory technicians for sample processing, testing and furnace operation. |
| Engineer / Maintenance | 2 | [#9, #8] Engineers to maintain generators, irrigation systems, robotic harvesters and heavy equipment. |
| Site Director / Executive Staff | 1 | [#27] Senior project director / site leadership included in long-term staffing. |
| Administrative Staff | 3 | [#5, #7] Administrative and security-clearance support, liaison and permit administration. |
Confidence Notes
Analyst notes are detailed with per-item ranges, enabling a mid-range estimate; however local real-estate, scope choices (purchase vs easement), and R&D program decisions create material uncertainty.