SCP-1455 Euclid ~ medium confidence
SCP-1455
Expected annual
$1.3M
One-time setup
$1.7M
Annual recurring
$1.3M
Personnel
13
Initial one-time capital to deploy a dedicated 36-room labyrinth and associated systems is approximately $1.66M, driven primarily by facility build-out, site doorframe retrofits, and contingency reserves; recurring annual costs are about $1.263M, driven by dedicated staff wages and administrative overhead.
🏗️ One-Time Capital Costs Total: $1.7M
Facilities $680K
[#1, #9] Labyrinth build-out (36-room modular array) and site doorframe retrofitting for a medium-sized site (example: 200affected doors).
Equipment $328K
[#2, #4, #5, #11, #12, #15, #3] Doors/frames, CCTV hardware, video storage/server, redundant locking systems, UPS/generator, spare door inventory, door actuators (one-time purchase & integration).
Risk Budget Reserve $300K
[#23] Insurance-like contingency/risk budgeting for cross-site consequences and rapid-response mitigation planning.
Incident Response Reserve $150K
[#21] One-time contingency fund allocation for emergency rebuilds, replacement of lost equipment, or rapid reconfiguration.
Contracting Premium $88K
[#10] NDAs, vetted contractors, covert/constrained construction premium (10–30% applied to contracted work).
Initial Research And Lab Setup $66K
[#13, #24] Mapping/instrumentation kit and secure air-gapped analysis workstation (lab instrumentation and initial research hardware).
Site Doorframe Audit $25K
[#8] Site-wide doorframe audit and measurement program to identify affected frames and required modifications.
Cover Story One Time $18K
[#19] One-time legal/cover-story & PR costs for initial construction and personnel moves.
Movement Logistics $5K
[#22] Specialized rigging/technicians for initial installation or occasional heavy moves of the door.
🔄 Annual Recurring Costs Total: $1.3M/yr
Staff Wages $940K/yr
[#6, #7] CCTV monitoring staff (3 operators + 1 supervisor) and dedicated containment & research team (3 researchers, 2 technicians, 4 rotating security) including on-call/overtime premiums.
Administrative Overhead $175K/yr
[#25] Program management, scheduling, procurement admin and invoicing (15–25% of recurring personnel/program costs).
Research And Monitoring $46K/yr
[#5, #13, #17] Ongoing video storage/licensing & analytics, mapping consumables, and archival/data-retention costs.
Facilities Maintenance $32K/yr
[#16] Annual preventive maintenance and replacement budget for doors, hinges, actuators, cameras and related capital (3–7% of capital equipment estimate).
Psychological Program $20K/yr
[#20] Psychological screening, counselling, and staff welfare programs to reduce turnover and operational risk.
Supplies And Consumables $16K/yr
[#14, #26] Experimentation consumables, temporary barriers, signage, paint touch-ups, labels, gloves, batteries, and miscellaneous small tools.
Training And Drills $16K/yr
[#18] Initial and recurrent staff training on use-protocols, misaligned-phase research procedures, and emergency drills.
It Support And Security $6K/yr
[#24] Ongoing support, updates, and security for air-gapped analysis workstation and forensic systems.
Redundant Locking Maintenance $6K/yr
[#11] Maintenance and testing for emergency locking and rapid isolation mechanisms.
Backup Power Maintenance $4K/yr
[#12] Generator/UPS maintenance and periodic fuel/exercise costs.
Mapping Consumables $3K/yr
[#13] Consumables for mapping/instrumentation kit (batteries, targets, mounting supplies).
Door Actuators Maintenance $500/yr
[#3] Annual maintenance for motorized door-actuation system (sensors, controllers, PLC updates).
Logistics And Transport $0/yr
[]
Cover Story And Legal $0/yr
[]
Video Storage And Licensing $0/yr
[]
Data Retention And Archival $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $1.3M/yr
94.5% probability / year
Normal operational year with scheduled 'use' compliance, routine maintenance, and no major incidents.
routine_operations scheduled_use_compliance
🚨 Minor Incident $1.4M/yr
5.0% probability / year +$97K vs baseline
Localized misalignment event requiring rapid-response team activation, door/frame replacements, overtime, and small repairs.
misaligned_phase_reaches_public_area localized_property_damage rapid_reconfiguration
🚨 Major Breach $1.9M/yr
0.5% probability / year +$597K vs baseline
Misalignment connects classified/public areas causing significant mitigation, cover-up, large-scale rebuilds, and reclassification operations.
misalignment_connects_classified_areas large_property_damage cover_up_operations
👥 Personnel 13 total
Role Count Notes
CCTV Operator / Analyst 3 [#6] Three shift CCTV operators to provide 24/7 monitoring.
CCTV Supervisor 1 [#6] Supervisor for alerts, escalation and analytics verification.
Research Scientist 3 [#7] Dedicated researchers to perform misaligned-phase research within the required window.
Technician 2 [#7, #13] Technical support for instruments, mapping, and rapid deployment during misaligned events.
Security Officer / MTF Agent 4 [#7] Four rotating dedicated security personnel for rapid-response and secure handling during misaligned/ambulatory phases.
📋 Confidence Notes
Estimates are based on detailed analyst line items and plausible midpoints, but many costs scale strongly with site size (door counts) and chosen security finish levels; contingency/reserve decisions introduce significant variance.
← SCP-1454 ↑ All SCPs SCP-1456 →