SCP-1476
Euclid
~
medium confidence
SCP-1476
Expected annual
$1.3M
One-time setup
$1.3M
Annual recurring
$1.2M
Personnel
9
Initial capital expenses are approximately $1.27M driven by dedicated aviary construction, generator/HVAC/incineration and mobile-disposal equipment. Recurring annual costs are approximately $1.21M/yr driven primarily by staff wages, MTF deployments/logistics, and ongoing research/consumables.
One-Time Capital Costs
Total: $1.3M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Routine year with no major incidents: normal staff, maintenance, patrols, and research/monitoring operations only.
no wild-population discovery
routine monitoring & maintenance
🚨
Minor Incident
$1.3M/yr
Localized wild population discovered requiring targeted MTF operations, mobile disposal deployments, limited environmental cleanup and amnestic administration to witnesses.
single moderate wild flock found
2–4 field deployments
small amnestic/cover-up operation
🚨
Major Mass Eradication
$2.2M/yr
Widespread wild populations discovered requiring multiple sustained eradication campaigns, large-scale mobile disposal, major environmental remediation and extensive amnestic/cover operations.
multiple large flocks across remote areas
prolonged multi-region eradication
extensive remediation & amnestic load
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#4] Minimum dedicated perimeter guards for the aviary; wage assumptions based on 2 × $40k. |
| Research Scientist | 2 | [#5] Two Level-3 senior research staff to authorize experiments and oversee studies. |
| Research Technician | 2 | [#5] Junior researchers/technicians for day-to-day research and husbandry support. |
| Animal Care Technician / Husbandry | 2 | [#6] Daily care, feeding and health checks for captive flock; staffing estimated 1–2 FTEs (here 2). |
| Data Analyst / Surveillance Monitoring | 1 | [#20] 0.5–1 FTE analyst responsible for sensor/camera monitoring and secure logging (budgeted as ~1 FTE). |
Confidence Notes
Estimates derive from analyst ranges; many line items have wide ranges (e.g., mobile disposal, incineration, MTF deployments) and incident frequency is uncertain. Staffing and baseline facility costs are better defined, but major-event probabilities and remediation/amnestic scales remain uncertain.