SCP-1511
Euclid
~
medium confidence
SCP-1511
Expected annual
$19.8M
One-time setup
$69.0M
Annual recurring
$18.3M
Personnel
29
Initial capital outlay dominated by aircraft/helicopter procurement, remote outpost construction, and a large contingency for possible scale-up; steady-state annual operations are driven by flight operations, field staffing, and contingency/overhead costs.
One-Time Capital Costs
Total: $69.0M
Annual Recurring Costs
Total: $18.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$18.3M/yr
Steady-state monitoring year with no major incidents or scale-up actions.
routine monitoring
scheduled maintenance
no unexpected landings or major crashes
🚨
Minor Incident
$19.8M/yr
Single recoverable crash/grounding or equipment loss requiring incident response, repairs and modest replacement purchases.
SCP-1511 instance descends and is damaged
localized environmental remediation and recovery operations
🚨
Major Breach
$20.8M/yr
Severe crash or multiple simultaneous incidents requiring major recovery, replacement of primary assets, extended remediation and investigative operations.
large-scale crash with heavy damage
multiple asset losses or prolonged recovery
🚨
Unexpected Scale Up
$78.3M/yr
Anomalous behavior increases frequency/severity requiring immediate route-wide containment scale-up (capital investment + elevated ops).
increased appearance frequency
hostile or hazardous behavior
decision to deploy route-wide continuous coverage
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#4] On-site security guards distributed across both outposts (part of the 24 outpost staff). |
| Technician / Field Specialist | 7 | [#4] Technicians and field specialists for equipment, power and comms at outposts. |
| Medical Officer | 3 | [#4] On-site medics and emergency medical support included in outpost staffing. |
| Administrative Staff | 4 | [#4] Site/admin/communications staff included in outpost staffing. |
| Research Scientist | 5 | [#5] Central specialized research team (analysis, linguistics, memetics, geophysics) at Site-197/HQ. |
Confidence Notes
Line-item estimates are taken from analyst notes where available; operational recurrence and contingency decisions carry uncertainty due to anomalous behavior and jurisdictional variability, so confidence is moderate.