SCP-1598
Euclid
~
medium confidence
SCP-1598
Expected annual
$5.7M
One-time setup
$4.5M
Annual recurring
$5.6M
Personnel
13
Estimated first-year capital (facility + equipment) is approximately $4.53M driven by heavy structural containment, specialized equipment, and redundant safety systems; expected annual operating costs are roughly $5.58M driven by staff wages, research, maintenance, utilities and contingency reserves.
One-Time Capital Costs
Total: $4.5M
Annual Recurring Costs
Total: $5.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.6M/yr
Normal year with no major incidents; routine operations, scheduled research and maintenance.
normal_operations
no_incidents
routine_maintenance
🚨
Minor Incident
$5.9M/yr
Localized equipment failure, small containment breach quickly contained, or staff injury requiring overtime and repairs.
equipment_failure
small_breach_contained
overtime_repairs
🚨
Major Breach
$6.6M/yr
Significant containment breach requiring extended response, cell repair, staff injuries/treatment and temporary relocation of some research functions.
major_containment_breach
extended_repair
mass_medical_response
🚨
Catastrophic Breach
$10.6M/yr
Total containment failure requiring site lockdown, public mitigation, large-scale decontamination, legal/PR expenses and major recovery operations.
total_containment_failure
public_exposure
mass_decontamination
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Surveillance Operator | 6 | [#12] Two operators per shift × 3 shifts = 6 FTEs covered by surveillance staff wages. |
| Level-2 Supervisor | 1 | [#12] Single Level‑2 supervisor on call; salary included in staff wages. |
| Direct-interaction Technician | 6 | [#13] 4–8 techs recommended; midpoint of 6 included in staff wages for direct in-cell work and attrition coverage. |
Confidence Notes
Analyst notes provide detailed line items and ranges allowing a mid-confidence estimate; major uncertainties remain in choices between capital purchase vs contract (incinerator vs disposal), degree of research scale, and size of catastrophic reserve which drive wide variance.