SCP-1621 Keter ~ medium confidence
SCP-1621
Expected annual
$13.3M
One-time setup
$24.1M
Annual recurring
$13.4M
Personnel
28
One-time capital and containment construction (~$24.1M) dominate upfront costs (stainless/copper containment, LN2 flood system, decontamination & decommissioning reserves). Recurring annual operations, staffing, legal/cover and remediation average ~ $10.9M/yr, with major breaches adding multi-million-dollar spikes.
🏗️ One-Time Capital Costs Total: $24.1M
Facilities $9.0M
[#1] Construction of BCA-09: stainless-steel/copper-lined containment chamber, soil bed, observation/maintenance access, clean-room shell, foundation and biosafety seals.
Decommissioning Fund $5.5M
[#24] One-time reserved fund for eventual safe closure, site remediation, cryogenic system dismantling and hazardous-waste remediation.
Initial Research And Lab Setup $2.8M
[#18] Research & pilot processing facilities: pilot plant equipment and analytical labs (capital).
Ln2 Flood System $1.8M
[#3] Bulk liquid nitrogen flood system capital: tanks, cryogenic pumps, insulated piping, automated valves, release systems and safety interlocks.
Legal And Permitting Initial $1.1M
[#19] Initial environmental permitting, legal, compliance and cover-up startup costs (permits, assessments, legal counsel).
Suits Initial $810K
[#9] Initial purchase of custom Level A polymer-sealed suits (8–20 units at custom prices); config for CO2/light-delivery ports.
Airlocks And Atmosphere Control $750K
[#2] Specialized multi-stage stainless/copper airlocks, hermetic safe rooms and atmosphere/pressure control systems with redundancy and detection integration.
Burn Incineration Chamber $600K
[#4] Stainless steel burn/incineration chamber capital with filters/scrubbers and hazardous-byproduct disposal hookups.
Hvac Inert Purge Scrubbers $600K
[#8] HVAC, inert-gas purge, scrubbers and redundant filtration (Cl2F6-compatible) installation.
Collection Storage System $475K
[#5] Collection, storage and transfer system for SCP-1621 byproduct: double-containment tanks, pumps, piping, valves, inert-blanketing and leak detection.
Power Backup Equipment $475K
[#13] Capital for UPS and backup generators sized for HVAC, pumps and control systems; includes generator infrastructure.
Gas Detection Installation $188K
[#7] Installation of very-low-ppb Cl2F6 gas detection network and networked alarm/integration with safe-room/sealing logic.
Piping Spares Initial $150K
[#6] Initial inventory of specialized piping, metal-to-metal seals and spare fittings rated for Cl2F6; custom parts stock.
Equipment $0
[]
🔄 Annual Recurring Costs Total: $13.4M/yr
Cover Story And Legal $3.6M/yr
[#19, #25] Ongoing environmental compliance, legal defense, cover-story operations, relocation/indemnification/community management budget.
Public Relations And Relocation $2.5M/yr
[#25] Ongoing community management, relocation/compensation and PR/cover operations for affected populations and infrastructure.
Staff Wages $2.1M/yr
[#10] 24/7 staffing roster (site director, lead scientists, lab/technical staff, security with hazmat training, maintenance, admin) including shift premiums, benefits.
Insurance And Liability $1.1M/yr
[#23] Insurance, liability reserves and self-insurance funds for property damage, medical exposures and cleanup.
Logistics And Transport $775K/yr
[#16, #17] Field surveillance and eradication teams, vehicles, remote sensors, drones, and hazmat-certified transport/escorts for specimens/byproduct.
Research And Monitoring $600K/yr
[#18] Ongoing pilot processing / R&D ops and analytical lab operations to process byproduct and monitor containment.
Hazardous Waste Disposal $525K/yr
[#20] Licensed disposal, chemical stabilization and secure storage costs for contaminated soil, filters and residues.
Emergency Response Readiness $500K/yr
[#12] Dedicated hazmat rapid-response unit readiness, vehicles, specialized crews and contractual emergency access.
Ln2 Consumables $350K/yr
[#14] Routine LN2 resupply for testing, drills and small-scale neutralizations (plus per-event consumption costs).
Corrosion Maintenance Reserve $300K/yr
[#22] Accelerated replacement reserve for corroded metal surfaces, fasteners, instrumentation housings and unexpected repairs.
Field Eradication Operations $200K/yr
[#15] Budget for periodic excavation/tilling, soil removal and LN2 neutralization campaigns for outlying colonies (per-operation reserve averaged annually).
Power Fuel And Maintenance $150K/yr
[#13] Fuel contracts, generator maintenance and UPS servicing.
Training And Certification $150K/yr
[#11] Initial and recurring training, contractor trainers, certification and quarterly emergency drills.
Hvac Consumables And Energy $125K/yr
[#8] Consumables and energy costs for HVAC, inert purge and filtration systems.
Supplies And Consumables $112K/yr
[#21] Consumables: seals, gaskets, filter cartridges, PPE consumables, calibration gases.
Piping Replacement Spares $88K/yr
[#6] Ongoing replacement of specialized piping, seals and custom fittings due to Cl2F6 corrosion (annual replacement reserve).
Suits Replacement And Repairs $85K/yr
[#9] Ongoing repairs, replacement parts and maintenance for custom Level A suits.
Burn Chamber Operation $55K/yr
[#4] Annual operation, permitted disposal and operation costs for burn/incineration chamber (~$10k–$100k/yr).
Collection System Maintenance $30K/yr
[#5] Maintenance and minor operations for collection/storage/transfer system for byproduct.
Sensor Calibration And Maintenance $25K/yr
[#7] Periodic calibration gases, certified maintenance and sensor replacement for Cl2F6 detection network.
Facilities Maintenance $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $13.4M/yr
88.0% probability / year
Normal year with steady-state containment, routine training, maintenance, and no major containment incidents.
routine_operations scheduled_training minor_repairs
🚨 Minor Incident $11.6M/yr
10.0% probability / year +$-1800000 vs baseline
Localized containment breach or field colony flare-up requiring LN2 response, emergency remediation and limited repairs.
small_breach localized_field_neutralization LN2_flood_event
🚨 Major Breach $17.7M/yr
2.0% probability / year +$4.3M vs baseline
Facility-scale breach or multi-site outbreak requiring full LN2 flood, extensive decontamination, large-scale hazardous disposal and major legal/relocation expenses.
facility_flooding widespread_contamination legal_exposure
👥 Personnel 28 total
Role Count Notes
Site Director / Executive Staff 1 Overall site leadership and liaison for containment and legal matters. [#10]
Lead Scientists 3 Xenobotany / chemistry leads overseeing containment research and byproduct handling. [#10]
Research Scientists / Technicians 8 Day-to-day lab operations, sample processing, pilot plant operation. [#10, #18]
Security Officer / MTF Agent 8 Hazmat-trained security for 24/7 containment, escorts and breach response. [#10]
Engineer / Maintenance 4 HVAC, cryogenics, generator, and containment system maintenance; corrosion repairs. [#6, #8, #13]
Administrative Staff 4 Logistics, procurement, compliance and administrative support. [#10, #19]
📋 Confidence Notes
Analyst notes provide detailed line items and plausible ranges, enabling order-of-magnitude estimates; uncertainty remains due to site-specific scale of retained colony, regulatory variability and the highly anomalous behavior of Cl2F6 interactions, so medium confidence is appropriate.
← SCP-1620 ↑ All SCPs SCP-1622 →