SCP-1708
Euclid
~
medium confidence
SCP-1708
Expected annual
$1.9M
One-time setup
$2.5M
Annual recurring
$1.9M
Personnel
16
Initial capital costs are approximately $2.5M driven by containment construction, specialized imaging/lab buildout and redundancy systems; ongoing annual operations are roughly $1.86M/year dominated by staff wages, research programs and site resiliency/maintenance.
One-Time Capital Costs
Total: $2.5M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal uneventful year with routine operations, maintenance and scheduled research activity.
normal_operations
scheduled_research
routine_maintenance
🚨
Minor Incident
$1.9M/yr
Minor self-harm or containment event causing limited room/equipment damage and medical treatment but no large breach.
self-harm_attempt
limited_structural_damage
minor_medical_response
🚨
Major Breach
$2.7M/yr
Significant containment failure requiring chamber reconstruction, major equipment replacement and extended incident response.
structural_collapse
equipment_destruction
extended_response_operations
🚨
Catastrophic Breach
$3.9M/yr
Large-scale containment catastrophe with environmental/hazardous contamination, relocation and major decommissioning/recovery costs.
catastrophic_structural_failure
hazardous_contamination
full_relocation_and_decommission
🚨
Research Scale Up
$2.3M/yr
Planned accelerated research year requiring additional contracted analysis, expanded lab capacity and temporary staffing.
intensive_materials_analysis
extended_contract_lab_work
temporary_staffing_increase
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#13] 24/7 site security staffing across shifts; specialized training for non-lethal containment and anti-reflection protocols. |
| Research Scientist | 3 | [#14, #11, #12, #28] Behavioral researchers, materials scientists and linguists conducting ongoing studies and experiments. |
| Technician | 2 | [#14, #7, #8] On-site technicians to operate acoustic/audio capture, surveillance and laboratory equipment. |
| Medical Officer | 1 | [#15, #9, #10] On-site nurse/medic for daily checks and emergency stabilization; supports medical monitoring. |
| Site Director / Executive Staff | 1 | [#16] Supervisory leadership and level-3 approvals / oversight. |
| Administrative Staff | 1 | [#16, #24] Procurement, local liaison, permits and cover-story administration. |
| Consulting Physician (retainer) | 0 | [#15] On-call/retainer physician (not on-site full-time) covered by recurring consulting fees. |
Confidence Notes
Detailed line-item ranges were provided allowing a reasonable mid-range estimate, but wide uncertainty remains for imaging choices (mobile CT vs contract), breach probabilities, and anomalous-specific equipment needs, so confidence is medium.