SCP-1742
Safe
~
medium confidence
SCP-1742
Expected annual
$5.9M
One-time setup
$45.2M
Annual recurring
$5.6M
Personnel
26
Up-front capital and containment fit-out dominate costs (~$45M one-time) driven by a BSL-4 upgrade, incineration and contingency reserves; recurring annual operations (PPE, staff, energy, disposal, research) are ~ $5.6M/yr.
One-Time Capital Costs
Total: $45.2M
Annual Recurring Costs
Total: $5.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.6M/yr
Normal operational year with no major incidents; routine research, containment, and scheduled maintenance only.
routine operations
scheduled research activities
no containment incidents
🚨
Minor Incident
$5.8M/yr
Localized field discovery or small containment retrieval requiring rapid response, extra legal/PR activity, and modest remediation.
single contaminated artifact recovered
small-scale retrieval and incineration
limited PR/legal/amnestic use
🚨
Major Breach
$10.6M/yr
Domicile-level outbreak requiring controlled demolition/cleanup, mass relocations and extensive remediation.
multi-unit domicile contamination
controlled demolition or large-scale cleanup
mass amnestic/relocation and legal settlements
🚨
Catastrophic Remediation
$25.6M/yr
Large-scale environmental contamination requiring long-term remediation, major public exposure management and prolonged monitoring.
widespread environmental contamination
failure of containment spread to public dwellings
long-term remediation and replacement
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 4 | [#5] Senior BSL-4-trained researchers (4) per analyst salary estimates. |
| Technician / Containment Technician | 6 | [#5] Laboratory and containment technicians handling samples and protocols. |
| Security Officer / MTF Agent | 8 | [#5] Armed security staff for perimeter and airlock control. |
| Waste / Maintenance Technician | 4 | [#5] Hazardous-waste handlers and facility maintenance personnel. |
| Medical Officer / Nurse | 2 | [#5, #29] Onsite medical coverage and post-exposure monitoring. |
| Administrative Staff / Site Manager | 2 | [#5] Admin and oversight (site manager, scheduling, compliance). |
Confidence Notes
Analyst notes provided detailed line items and ranges; midpoints and recommended reserves were used. Significant variability arises from site-dependent capital costs, incident severity, and contingency sizing, so estimates are indicative rather than precise.