SCP-1768
Euclid
~
medium confidence
SCP-1768
Expected annual
$19.0M
One-time setup
$9.5M
Annual recurring
$16.0M
Personnel
51
Initial containment build-out for three instances is estimated at about $9.5M one-time, with annual operating costs driven by staff, insurance, and contingency/reserve allocations totaling roughly $16M per year; breach remediation reserves (potentially hundreds of millions) are the largest tail risk.
One-Time Capital Costs
Total: $9.5M
Annual Recurring Costs
Total: $16.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$16.0M/yr
Normal operational year with routine maintenance, monitoring, and no containment breaches; recurring costs only.
no breaches
routine maintenance
scheduled transfers
🚨
Minor Incident
$16.7M/yr
Localized contamination or small breach requiring targeted remediation and legal/PR work.
small chamber contamination
localized soil/floor replacement
minor public exposure
🚨
Major Breach
$41.0M/yr
Significant propagation event requiring multi-hectare remediation, extended operations, and large settlements.
multi-hectare contamination
extensive infrastructure replacement
high-profile exposure
🚨
Catastrophic Breach
$516.0M/yr
Widespread regional contamination (dozens+ km²) causing multi-year remediation and economic impacts.
large-area propagation
mass evacuations
regional infrastructure loss
Personnel
51 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 36 | [#6] 12 guards per chamber for three chambers to cover rotations and leave; wages assumed ~$50k/yr each. |
| Research Scientist | 3 | [#7, #15] Senior researcher assigned per instance; salary assumed ~$140k/yr each. |
| Technician / Maintenance | 6 | [#7, #17] Two technicians per instance; salaries assumed ~$70k/yr each; cover sensor/rigging maintenance and routine replacements. |
| Engineer / Maintenance | 2 | [#9, #10] Facility engineers for HVAC, power, and heavy systems maintenance. |
| Administrative Staff | 4 | [#24] Program admin, scheduling, accounting and liaising for containment operations. |
Confidence Notes
Estimates are built from line-item ranges in analyst notes and a chosen operational scale (3 chambers). Many inputs have wide ranges (especially remediation, insurance and contingency allocations), so totals are approximate; staffing and equipment costs are better-constrained than breach/remediation tail risks.