SCP-1798
Safe
~
medium confidence
SCP-1798
Expected annual
$2.1M
One-time setup
$2.8M
Annual recurring
$1.7M
Personnel
13
Up-front capital purchase and build-out are estimated at approximately $2.79M (major drivers: laboratory instrumentation, incinerator/disposal capability, and facility build-outs). Annual operating costs are about $1.70M/year driven primarily by dedicated staff wages, security, monitoring/analysis, disposal and contingency funds.
One-Time Capital Costs
Total: $2.8M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal year with scheduled research, routine terminations, and no major containment incidents.
scheduled testing
routine terminations
no breaches
🚨
Minor Incident
$1.8M/yr
Small containment breach or localized equipment failure requiring repairs, targeted decontamination, and temporary staffing overtime.
localized breach
equipment failure
limited contamination
🚨
Major Breach
$21.7M/yr
Integration/fusion event or multi-instance breach requiring large-scale containment response, structural repairs, mass terminations and long remediation.
multi-instance fusion
facility-level breach
structural damage requiring demolition
🚨
Political Exposure
$2.2M/yr
Information leak or public incident forcing heavy PR, legal settlements and expanded cover-story operations.
media leak
local authority involvement
civil suits
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Senior Researcher / Principal Investigator | 1 | [#10] Dedicated senior researcher responsible for program management. |
| Research Scientist (Xenobiologist / Botanist) | 1 | [#11] Lead scientist for propagation and analysis. |
| Technician | 2 | [#11] Two technical support staff for sample prep, propagation and monitoring. |
| Medical Officer | 1 | [#12] Onsite physician for clinical monitoring and emergency response. |
| Nurse | 2 | [#12] Nursing staff for continuous clinical monitoring during ingestion trials. |
| Security Officer / MTF Agent | 6 | [#13] Dedicated guards for 24/7 coverage of botanical wing and humanoid cells (three-shift rotation). |
Confidence Notes
Line-item estimates are order-of-magnitude budgetary figures from analyst notes; major uncertainties include choice of capital vs contract analysis/disposal, site-specific installation costs, and low-frequency high-impact breach outcomes which are difficult to quantify precisely.