SCP-1801
Keter
~
medium confidence
SCP-1801
Expected annual
$41.2M
One-time setup
$204.1M
Annual recurring
$40.8M
Personnel
104
Initial capital outlay is approximately $204M driven by purpose-built Level-4 facility construction, specialized high-containment equipment, contingency reserves and insurance; recurring annual costs are roughly $40.8M driven by staff wages, high-intensity research programs, hazard pay, and ongoing security/maintenance.
One-Time Capital Costs
Total: $204.1M
Annual Recurring Costs
Total: $40.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$40.8M/yr
Normal year with no major incidents; containment and research operate as planned.
routine operations
scheduled research activity
🚨
Minor Incident
$42.3M/yr
Localized accidental exposure or small containment breach requiring on-site response, temporary shutdown and targeted testing/quarantine.
accidental sample leak
single-person exposure
minor HVAC/filtration failure
🚨
Major Breach
$50.8M/yr
Significant containment failure with multiple exposures or an escape, requiring regional mobilization, extended shutdown, community response and large legal/compensation actions.
multi-person exposure
external escape
large HVAC/structure failure
🚨
Political Exposure
$45.8M/yr
Public leak or political discovery forcing large-scale deniability, legal battles, and expensive cover operations.
major leak to press
regulatory investigation
whistleblower exposure
Personnel
104 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 60 | [#7] 24/7 armed perimeter and building security, roving teams and static posts. |
| Research Scientist | 12 | [#10] Senior scientists, virologists and prion specialists on-site. |
| Lab Technician | 8 | [#10] BSL-4 trained technicians and biosafety officers supporting scientists. |
| Medical Officer | 10 | [#9] Infectious disease physicians, critical care clinicians for on-site patients. |
| Internal Security Response / Tactical | 5 | [#8] Rapid response team for internal incidents and use-of-force actions. |
| Engineer / Maintenance | 4 | [#2, #5, #14] HVAC, power, effluent and equipment maintenance staff. |
| Administrative Staff | 3 | [#23, #25] Site admin, permitting liaison and classified IT support. |
| Site Director / Executive Staff | 2 | [#1] Executive oversight and approvals for facility operations. |
Confidence Notes
Notes are detailed and provide ranges for nearly every line item, allowing a medium-confidence aggregation; large uncertainty remains due to wide ranges (construction regional variance, research program scale, and insurance/deniability variability).