SCP-1826
Neutralized
~
medium confidence
SCP-1826
Expected annual
$87K
One-time setup
$1.2M
Annual recurring
$42K
Personnel
3
One-time setup and remediation risks dominate (~$1.16M) driven by site acquisition, secure enclosures, robotics/recording equipment, lab fit-out, and contingency; baseline annual operations are minimal (~$42.5k/yr) because the object is Neutralized, but episodic active-research years or demolition/remediation years can raise annual costs into the hundreds of thousands.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $42K/yr
Cost Scenarios
📊
Baseline
(baseline)
$42K/yr
Neutralized, minimal monitoring and archive posture with occasional verification visits and modest contingency and training.
confirmed neutralization
annual archive checks
minimal monitoring only
🚨
Full Active Research
$652K/yr
Active containment and research posture with full staffing, on-site security during March, ongoing animal care for relocated fauna, robotics operations, and high-rate data capture.
decision to resume active testing
seasonal March operations
long-term captive program maintained
🚨
Decommissioning Demolition
$542K/yr
Site demolition and hazardous remediation in response to contamination concerns or policy decision to remove the site permanently.
confirmed contamination
O5/administrative decision to demolish
major remediation required
🚨
Minor Incident
$88K/yr
A localized breach/reactivation or emergency during March requiring EMT standby, repairs, targeted remediation, and surge logistics without full program reactivation.
unexpected reactivation during March
isolated casualty or contamination requiring response
short-term surge in security/research presence
Personnel
3 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 1 | [#3] Minimal on-site security/caretaker in neutralized posture (one local guard/caretaker). |
| Research Scientist | 1 | [#13] Part-time local research liaison or on-call scientist to review archives and coordinate verifications. |
| Administrative Staff | 1 | [#18, #24] Site liaison / admin to manage permits, local government relations and minimal clandestine coordination. |
Confidence Notes
Analyst notes provide detailed line items and realistic ranges for Ukrainian local costs, but many costs depend on posture choice (neutralized vs active), unknown contamination risk, and frequency of March testing; midpoints and policy assumptions introduce moderate uncertainty.