SCP-1843
Safe
~
medium confidence
SCP-1843
Expected annual
$1.7M
One-time setup
$12.4M
Annual recurring
$1.5M
Personnel
11
Total one-time capital costs are dominated by potential land acquisition and site hardening; recurring annual costs are dominated by staffing (security, research, veterinary) and ongoing monitoring/freezer power. Baseline annual operations are estimated at roughly $1.48M/year, while initial capital outlay can exceed $12M if surrounding land must be purchased.
One-Time Capital Costs
Total: $12.4M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal year with routine monitoring, staffing and occasional specimen processing; no major incidents or land purchases.
routine monitoring
scheduled testing
typical wildlife incursions handled
🚨
Minor Incident
$1.8M/yr
Localized surge event: multiple SCP-1843-A events / mass gatherings of Ovis requiring emergency wildlife control, extra necropsies, temporary compensations and overtime.
mass Ovis approach
multiple SCP-1843-A events
emergency wildlife control
🚨
Major Breach
$7.5M/yr
Severe containment exposure or political pressure requiring large-scale response including expedited land purchases/easements, widespread buyouts, major PR/legal action and capital replacements.
public discovery / media exposure
need to acquire/control surrounding land
large-scale ecological/containment incident
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] 24/7 coverage recommended; minimal allocation of 6 dedicated guards to cover shifts (6 × $45k/yr). |
| Research Scientist (Level-4 oversight) | 1 | [#6] One L4 oversight position (part-time stipend included in research personnel costs). |
| Research Technician | 2 | [#6] Two technicians for sample prep and field tests (salaries included in research personnel estimate). |
| Veterinarian | 1 | [#7] On-call/full or part-time veterinarian for necropsies and animal welfare oversight (FTE approximated to 1). |
| Veterinary Technician | 1 | [#7] One vet tech to support veterinary duties and field operations. |
Confidence Notes
Estimates are based on analyst-provided ranges and reasonable midpoints; major uncertainty stems from whether Site-12 already controls the 2.5 km buffer (land acquisition swings multi-million dollars) and from optional choices (purchase vs outsource equipment). Staffing and recurring utility/monitoring costs are better constrained.