SCP-1846 Euclid-exsequi ~ medium confidence
SCP-1846
Expected annual
$2.2M
One-time setup
$3.8M
Annual recurring
$2.1M
Personnel
10
Estimated one-time implementation costs are approximately $3,770,000, driven mainly by structural/enclosure work and optional transport pod acquisition; annual recurring costs are about $2,140,750 per year, largely driven by security staffing and an ongoing research program.
🏗️ One-Time Capital Costs Total: $3.8M
Equipment $2.0M
[#2, #3, #4, #5, #6, #7, #10, #15] Reinforced laminated glass upgrade; mobile reinforced transport pod; exterior anemometers and alarm network hardware; HVAC/downdraft management installation; critical-power generator/UPS equipment; CCTV/access-control hardware; cold-storage; initial PPE/granular-tool kits.
Strategic Reserve Seed $1.0M
[#24] One-time seed allocation from long-term contingency for potential rapid scale-up, secure trials, or strategic response (seed/trust/reserve portion of item #24).
Facilities $475K
[#1, #11] Type-3 cell modification (granular-friendly / reinforced concrete fallback) and secure greenhouse construction: structural engineering, permits, demolition/repairs, and greenhouse buildout.
Initial Research And Lab Setup $250K
[#12] Initial lab buildout and instruments for botany/nutrition/security research, baseline lab consumables and setup for controlled trials.
🔄 Annual Recurring Costs Total: $2.1M/yr
Staff Wages $700K/yr
[#8] 24/7 security coverage and containment technician salaries (baseline guards + containment techs, benefits, overtime premiums).
Research And Monitoring $600K/yr
[#12] Ongoing botany/nutrition/security research program costs (researcher salaries, trials, lab consumables, long-term monitoring).
Facilities Maintenance $214K/yr
[#4, #5, #6, #7, #10, #11, #17, #18] Ongoing maintenance and energy for anemometers, HVAC energy/maintenance, generator fuel/service, CCTV maintenance, cold-storage energy, greenhouse operations, structural repair budget for downdraft damage, and lifecycle replacement reserve for panels/seals.
Cover Story And Legal $150K/yr
[#20] Legal, PR, permits, and plausible-deniability funds for civilian damage, cover stories, and expedited administrative actions.
Emergency Response Retainer $150K/yr
[#16] Annual retainer for rapid-response structural/heavy-equipment/contractor teams to perform emergency repairs and reduce downtime.
Medical Monitoring And Dietary Supervision $95K/yr
[#9] Part-time attendant physician, diagnostic testing, emergency medical staffing, and dietary supervision for maize-only diet and corn-syrup coercion protocols.
Confidentiality And Security Staffing $90K/yr
[#21] Classification management, additional security-clearance pay, psych support and secure recordkeeping for staff working directly with SCP-1846.
Opportunity Cost $52K/yr
[#23] Restricted-use real-estate premium / lost-use compensation for the area exterior to the cell and repurposed site footprint.
Supplies And Consumables $32K/yr
[#10, #13, #14, #15, #25] Annual food procurement (whole ears of maize/corn syrup), pest control consumables, waste handling/composting/disposal, PPE replacements and replacements/training, and incident-specific consumables.
Training And Drills $30K/yr
[#19] Regular drills, SOP updates, certifications, and simulation equipment for wind-anomaly procedures and feeding/coercion protocols.
Logistics And Transport $28K/yr
[#22] Secure transportation for maize deliveries, greenhouse supplies, and occasional secure transit operations.
Cost Scenarios
📊 Baseline (baseline) $2.1M/yr
87.0% probability / year
Normal year with no major incidents; routine operations, staffing, research, and maintenance only.
no incidents steady-state operations
🚨 Minor Incident $2.2M/yr
10.0% probability / year +$70K vs baseline
Localized downdraft-related damage or equipment failure requiring rapid repairs and small-scale contractual support.
localized exterior damage sensor/equipment replacement
🚨 Major Breach $2.9M/yr
2.0% probability / year +$750K vs baseline
Significant containment event or structural failure requiring major repairs, panel replacements, large contractor work, and heightened response.
structural failure large downdraft-induced damage major contractor mobilization
🚨 Political Exposure $2.6M/yr
1.0% probability / year +$500K vs baseline
Civilian detection or media/legal exposure requiring extensive cover-up, PR, legal settlements, and external repairs.
civilian detection media/legal escalation
👥 Personnel 10 total
Role Count Notes
Security Officer / MTF Agent 8 Eight guards for three-shift 24/7 coverage; primary driver of security wages in staff_wages [#8].
Containment Technician 2 Two containment techs for direct interaction, feeding, and maintenance; included in staff_wages [#8].
📋 Confidence Notes
Analyst notes provide detailed line-item ranges for most categories, enabling a reasoned estimate; uncertainty remains due to optional choices (glass vs concrete, transport pod procurement, and potential exploitation costs), hence medium confidence.
← SCP-1845 ↑ All SCPs SCP-1847 →