SCP-1848
Euclid
~
medium confidence
SCP-1848
Expected annual
$4.4M
One-time setup
$3.7M
Annual recurring
$4.1M
Personnel
24
Initial one-time capitalization for hardened containment, robotics, vehicles, secure IT, and contingency funds is approximately $3.71M; annual recurring costs (staff wages, maintenance, research, medical, and cover operations) are approximately $4.10M, driven primarily by personnel wages and high maintenance/contingency reserves.
One-Time Capital Costs
Total: $3.7M
Annual Recurring Costs
Total: $4.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.1M/yr
Normal year with no major incidents; routine operations, maintenance, and research continue.
normal_operations
no_breach
🚨
Minor Incident
$4.6M/yr
Brief containment breach or staff exposure requiring medical care, amnestics, limited repairs, investigation, and PR/legal actions.
brief_containment_breach
staff_exposure
minor_facility_damage
🚨
Major Breach
$6.6M/yr
Large-scale containment failure requiring evacuation, extensive recontainment efforts, major repairs, legal settlements, and major PR/cover operations.
coordinated_breach
site_lockdown
catastrophic_infrastructure_damage
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#5] Eight regularly rotating guards assigned to SCP-1848 as stated in containment procedures. |
| QRF / Rapid Response Team | 6 | [#6] On-call containment breach team (4–8 personnel); modeled here as 6 personnel. |
| Research Scientist | 4 | [#7] Multi-disciplinary research team (containment lead, cognitive scientist, behavioral analyst, systems engineer). |
| Senior Containment / Lead | 1 | [#10] Designated senior containment officer (anchor) responsible for procedures and oversight. |
| Administrative Staff | 3 | [#11] Personnel for request processing, redaction, and paperwork (2–3 FTEs assumed). |
| Investigations & Forensics | 2 | [#21] Team to perform incident investigations and forensic analysis after breaches. |
Confidence Notes
Notes provide detailed line items for containment, personnel, and recurring maintenance, allowing a medium confidence estimate; significant uncertainty remains in breach frequency/severity and contingency fund sizing due to anomalous behavior and long historical variance.