SCP-1850
Safe
~
medium confidence
SCP-1850
Expected annual
$710K
One-time setup
$116K
Annual recurring
$694K
Personnel
12
One-time baseline capital of $115,500 for hangar upgrades, freezers, sensors and specialized equipment; recurring operating costs approximately $694,250/year driven primarily by staff wages, animal procurement, aircraft escort operations, and research/medical monitoring.
One-Time Capital Costs
Total: $116K
Annual Recurring Costs
Total: $694K/yr
Cost Scenarios
📊
Baseline
(baseline)
$694K/yr
Normal year with scheduled operations, tethered flights, routine research and no containment incidents.
routine_operations
scheduled_tethered_flights
ongoing_research
🚨
Minor Incident
$734K/yr
Small containment or medical incident requiring emergency veterinary procedures, limited structural repairs and extra monitoring.
minor_structural_damage
unexpected_medical_procedure
localized_contamination
🚨
Major Breach
$1.1M/yr
Significant containment breach or seismic incident causing structural damage, aircraft loss/damage, extensive repairs and public/legal response.
seismic_event
containment_breach
extensive_structural_repairs
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Veterinarian | 1 | [#10] 0.5–1.0 FTE recommended; baseline set to 1 FTE to cover health checks and procedures. |
| Animal Tech / Handler | 2 | [#10, #15] Feedings, warming, cleaning and day-to-day husbandry; staffing to cover 73 washes/yr and feed cycles. |
| Pilot / Flight Ops | 2 | [#13, #14] Two escort pilots (part-time/rotating) to support tethered flights. |
| Flight Operations Coordinator | 1 | [#14] Mission planning, safety compliance and coordination of aircraft sorties. |
| Security Officer / MTF Agent | 3 | [#17] Incremental dedicated security allocation for access control, patrols and two-person entry procedures. |
| Engineer / Maintenance | 1 | [#1, #2, #6] HVAC, structural anchor checks, freezer and equipment maintenance support. |
| Research Scientist | 1 | [#11, #21] Oversees monitoring, isotopic studies and discretionary research projects. |
| Administrative Staff | 1 | [#23, #24] Records, procurement coordination, cover-story administration and compliance paperwork. |
Confidence Notes
Analyst notes provide detailed ranges for most items, enabling reasonable mid-point estimates; uncertainty remains around whether site aviation assets are available, local disposal/regulatory costs, and intensity of discretionary research, so confidence is medium.