SCP-1870
Euclid
~
medium confidence
SCP-1870
Expected annual
$1.2M
One-time setup
$1.7M
Annual recurring
$1.2M
Personnel
8
One-time setup and retrofit estimated at $1,746,000 driven by site acquisition, containment upgrades, emergency reserve seed and research/cover setup; recurring annual operations estimated at $1,190,000/year dominated by staff wages, emergency reserve replenishment, contingency and ongoing research/monitoring.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal operational year with routine monitoring, no major incidents.
routine_operations
scheduled_research
no_breach
🚨
Minor Incident
$1.3M/yr
Localized containment incident requiring repairs, limited amnestic use and temporary increased staffing.
localized_breach
equipment_failure
small_scale_amnestic_use
🚨
Major Breach
$1.8M/yr
Significant breach or mass anomalous event requiring large-scale response, temporary relocation and major repairs.
major_containment_breach
large_scale_amnestic_deployment
site_repair_and_restock
🚨
Political Exposure
$2.7M/yr
Partial or full public exposure requiring legal payouts, site remediation, large PR/cover operations and long-term reimbursements.
public_discovery
local_authority_involvement
liability_claims
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | [#9] Two full-time research staff to conduct interviews, documentation and experiments. |
| Security Officer / MTF Agent | 2 | [#10] Minimal on-site security presence to enforce access control and respond to incidents. |
| Site Supervisor / Security Manager | 1 | [#11] Senior staff to oversee containment and liaison duties. |
| E-class Personnel | 2 | [#12] Operatives used for interviews and expendable/tester roles (housing and turnover costs included in recurring budget). |
| Medical Officer | 1 | [#13] Part-time/on-call medic for injuries, routine checks and psychological support. |
Confidence Notes
Analyst notes provided line-item estimates for most cost areas allowing a mid-range build; uncertainty remains due to anomalous behavior (changing counts, unpredictable breaches) and choices about research scale and reserve levels, so confidence is medium.